New Year Special Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: mxmas70

Home > USGBC > Leadership in Energy and Environmental Design (LEED) > LEED-AP-O+M

LEED-AP-O+M LEED AP Operations + Maintenance (LEED AP O+M) Question and Answers

Question # 4

What information regarding a lamp is required to comply with Materials and Resources Credit, Purchasing - Lamps?

A.

Rated life

B.

Light trespass

C.

Power demand

D.

Luminary equivalency

Full Access
Question # 5

What is the maximum length of time allowed for a gap in performance monitoring before needing to restart the performance period?

A.

One full week

B.

Two full weeks

C.

Three full weeks

D.

Four full weeks

Full Access
Question # 6

Innovation credits for exemplary performance are awarded for

A.

reaching 100% threshold

B.

demonstrating significant environmental benefits

C.

achieving the next incremental threshold

D.

demonstrating a quantitative improvement in environmental performance

Full Access
Question # 7

What is the maximum number of points possible for the Exemplary Performance option of the Innovation Credit, Innovation?

Calculator

A.

1 point

B.

2 points

C.

3 points

D.

4 points

Full Access
Question # 8

Which of the following strategies is allowed under Energy and Atmosphere Credit, Renewable Energy and Carbon

Offsets, and will help a project achieve Energy and Atmosphere Credit, Optimize Energy Performance?

A.

Install an on-site photovoltaic array

B.

Purchase Green-e certified carbon offsets

C.

Purchase Green-e certified Renewable Energy Certificates (RECs)

D.

Install an on-site geothermal energy with a ground-source heat pump

Full Access
Question # 9

A standard reference when creating an indoor air quality management program is

A.

Home Energy Rating System (HERS)

B.

American Society of Heating, Refrigerating and Air - Conditioning Engineers 90.1 - 2010 (ASHRAE)

C.

Chartered Institution of Building Services Engineers (CIBSE)

D.

Indoor Air Quality Building Education and Assessment Model (I-BEAM)

Full Access
Question # 10

A district energy system provides chilled and hot water to a building on a campus. What equipment must be commissioned to meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Analysis, Option 1. Existing Building Commissioning?

A.

Heat exchangers

B.

Central plant chillers

C.

Primary chilled water pump

D.

Central plant cooling tower

Full Access
Question # 11

What type of Credential does the principal participant of a project need to earn in order to achieve one point in the innovation credit?

A.

LEED Fellow

B.

LEED Green Rater

C.

LEED Green Associate

D.

LEED Accredited Professional (AP) with a specialty appropriate for the project

Full Access
Question # 12

A LEED AP is reviewing construction documents to identify the regularly occupied spaces on a project to ensure that floor area values are utilized consistently across credits. What aspects of each space should the LEED AP consider?

A.

Rate of outdoor air provided per person

B.

Fire ratings of installed wall and ceiling assemblies

C.

Maximum number of intended occupants standing or seated

D.

Typical duration of intended occupancy in each space per day

Full Access
Question # 13

The intent of the Energy and Atmosphere Credit, Enhanced Refrigeration Management is to reduce ozone depletion and support early compliance with the

A.

Kyoto Protocol while minimizing direct contributions to climate change

B.

Montreal Protocol while minimizing direct contributions to climate change

C.

Kyoto Protocol while minimizing direct and indirect contributions to climate change

D.

Montreal Protocol while minimizing direct and indirect contributions to climate change

Full Access
Question # 14

Which of the following appliances are included in Water Efficiency Prerequisite, Indoor Water Use Reduction?

A.

Residential dishwashers and coffee makers

B.

Residential clothes washers and dishwashers

C.

Residential dishwashers and drinking fountains

D.

Residential clothes washers and vending machines

Full Access
Question # 15

What requirement must be met when creating a demand response program that satisfies Energy and

Atmosphere Credit, Demand Response?

A.

Demonstrate a load shift reduction of 5% in the building

B.

Permanently reduce the energy consumption in the building by 5%

C.

Have the building management sign a two-year demand response enrollment

D.

Create a comprehensive plan for meeting the contractual commitment during a demand response event

Full Access
Question # 16

A management method that could be included in a project's site management policy is the use of

A.

high-decibel equipment instead of low-decibel equipment

B.

electric-powered equipment instead of gasoline-powered equipment

C.

mechanical equipment instead of non-powered manual methods

D.

exterior maintenance beyond the minimum levels required to maintain site safety

Full Access
Question # 17

An office building has an average annual occupancy of 75% and 30,000 ft2 (2 787 m2) of completely vacant space.

How many occupants should be entered into Portfolio Manager for the vacant office space?

A.

Zero occupants

B.

100 occupants

C.

150 occupants

D.

200 occupants

Full Access
Question # 18

Under Energy and Atmosphere Credit, Optimize Energy Performance, for buildings eligible to receive an energy performance rating using the Environmental Protection Agency's ENERGY STAR® Portfolio Manager what is the minimum rating to receive points?

A.

50

B.

70

C.

76

D.

85

Full Access
Question # 19

In the calculations for Water Efficiency Prerequisite, Indoor Water Use Reduction, private use refers to lavatory faucets used by which of the following types of occupants?

A.

Prisoners, hospital inpatients, hotel staff

B.

Apartment residents, motel guests, nursing home residents

C.

Students, hospital staff, hotel guests

D.

Dorm residents, fire-station staff, nursing home staff

Full Access
Question # 20

A building manager changes the sequence of operation for boilers to better match heating demand as a result of an ASHRAE Level 2 analysis. Which of the following is an example of an appropriate topic for training of building operations staff to continue implementation of this change and meet the requirements of Energy and Atmosphere Credit, Existing Building Commissioning - Implementation?

A.

Sensor calibration

B.

Test and balance procedures

C.

Cooling tower water management

D.

Operating schedules and requirements

Full Access
Question # 21

What strategy should be performed if submetering of the irrigation system is not available or difficult to implement for an existing building to comply with the Sustainable Sites Credit, Site Management?

A.

Inspect irrigation systems for leaks once per year

B.

Perform irrigation management tasks manually on a daily basis

C.

Use automated leak detection systems, such as those that use pressure sensors

D.

Correct any deficiencies that are discovered in the irrigation system prior to the performance period

Full Access
Question # 22

Which of the following prerequisites or credits have synergies with Materials and Resources Prerequisite, Facility Maintenance and Renovation Policy?

A.

Sustainable Sites Credit, Site Management

B.

Materials and Resources Credit, Purchasing - Lamps

C.

Energy and Atmosphere Prerequisite, Fundamental Refrigerant Management

D.

Indoor Environmental Quality Credit, Indoor Air Quality Management Program

Full Access
Question # 23

What credit or prerequisite requires a plan for a hazardous spill cleanup?

A.

Indoor Environmental Quality Prerequisite, Green Cleaning Policy

B.

Materials and Resources Credit, Solid Waste Management - Ongoing

C.

Indoor Environmental Quality Credit, Enhanced Indoor Environmental Quality Strategies

D.

Indoor Environmental Quality Credit, Indoor Environmental Quality Management Program

Full Access
Question # 24

The environmentally preferable purchasing policy (EPP) required in the Materials and Resources Prerequisite, Ongoing Purchasing and Waste Policy should address the criteria in which Materials and Resource Credit?

A.

Purchasing - Lamps

B.

Solid waste management - Ongoing

C.

Purchasing - Facility maintenance and renovation

D.

Solid waste management - Facility maintenance and renovation

Full Access
Question # 25

An equipment upgrade requires an initial investment of $1,500.00 USD with a total annual savings of $500.00 and a 33% rate of return. What is the Simple Payback Period for this improvement?

A.

120 days

B.

495 days

C.

Two years

D.

Three years

Full Access
Question # 26

What is the minimum percentage reduction from the baseline required to earn the exemplary performance point for the Indoor Water Use Reduction Credit, Option 2?

A.

20%

B.

25%

C.

30%

D.

35%

Full Access
Question # 27

Which system can significantly reduce or completely eliminate the amount of potable water used for irrigation?

A.

Drip irrigation system

B.

Irrigation metering system

C.

Moisture sensor system

D.

Rainwater collection system

Full Access
Question # 28

Which of the following strategies satisfy the Sustainable Sites Credit, Rainwater Management?\

A.

Perform the Small Storm Hydrology method to calculate the runoff volume on 95% of the site

B.

Minimize impervious cover to be maximum 80% of the site area for the 95th percentile of storm events with design alterations or verification

C.

Harvest and treat enough rainwater to cover 25% of the impervious surfaces, for the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

D.

Include rain gardens on the project site for 15% of the of the impervious surfaces, in order to absorb the 95th percentile storm event, that otherwise would be lost in the sewage system or runoff the site

Full Access
Question # 29

Which of the following is an allowable method to increase cooling tower cycles of concentration?

A.

Reduce confing tower run-hours

B.

Increase quantities of potable makeup water

C.

Increase treatment levels of potable makeup water

D.

Decrease intervals between cooling tower water testing

Full Access
Question # 30

A tenant is moving into a new space in an existing building. They will fit out this new space and are considering LEED Certification. The tenant is projecting that 80% of the space will be used as office space. They will also have 10% of the space serving as a data center supporting the office. The remaining 10% will be used as a store showcasing and selling their consumer products for direct purchase to the general public. According to the Rating System Selection

Guidance, which rating system would be most applicable for this project?

A.

LEED Interior Design and Construction: Retail

B.

LEED Operations and Maintenance: Retail

C.

LEED Building Design and Construction: Data Centers

D.

LEED Interior Design and Construction: Commercial Interiors

Full Access
Question # 31

An urban office building project is installing a cooling tower. To save on potable water, the project would like to use a non-potable water source to provide 20% of the cooling tower makeup water to achieve the maximum number of points under Water Efficiency Credit, Cooling Tower Water Use. Which non-potable water source would be the most appropriate for use?

A.

Municipally supplied tap water

B.

Ground source stormwater runoff

C.

Air conditioner condensate

D.

Graywater from the building's hand-washing sinks

Full Access
Question # 32

Which of the following prerequisites or credits has a minimum occupancy requirement?

A.

Indoor Environmental Quality Credit, Daylight and Views

B.

Water Efficiency Prerequisite, Indoor Water Use Reduction

C.

Energy and Atmosphere Prerequisite, Minimum Energy Performance

D.

Indoor Environmental Quality Prerequisite, Minimum Indoor Air Quality Performance

Full Access
Question # 33

Under what scenario must building visitors be surveyed for the Location and Transportation Credit, Alternative Transportation, Option 1?

A.

When the number of visitors reaches 10% the number of regular building occupants

B.

During the transportation survey period all visitors need to be invited to participate in the survey

C.

Every day no matter the number of visitors in relation to the number of regular building occupants

D.

When either the typical peak or daily average is greater than the number of regular building occupants

Full Access
Question # 34

Which of the following scenarios contributes towards the achievement of Indoor Environmental Quality Credit, Daylight and Quality Views, Option 2. Quality Views?

A.

A workstation with a skylight directly above

B.

An office with windows that are completely covered by inoperable shades

C.

A glass conference room with a view of office plants

D.

An executive office with a view of a park

Full Access
Question # 35

Cooling tower blowdown is necessary because

A.

too much water in the system is inefficient so its water levels must be lowered

B.

a buildup of dissolved solids increases conductivity which decreases efficiency

C.

excess water treatment chemical levels corrode pipes and bleed-off reduces chemical levels

D.

cold temperatures can freeze pipes if water is not moved and bleed-off prevents that from happening

Full Access
Question # 36

A LEED AP performs several on-site reviews for LEED compliance and encounters the followingscenarios. Which scenario requires the installation of additional meters to comply with Energy and Atmosphere Prerequisite, Building-Level Energy Metering?

A.

A school whose electricity usage is being measured and invoiced by the local electrical utility

B.

A building plus its addition whose electricity and natural gas usage is being measured by the original building's meters

C.

A data center that receives electricity from a campus plant and whose meters are located at the electrical service entrances

D.

A building that shares its chilled water usage with other buildings on a campus and whose chilled water consumption is measured at the campus level

Full Access
Question # 37

A LEED project is considering converting 75% of its existing composite roof to a vegetated roof. The project's landscape architect also suggests an open-grid pavement system for 30% of the site paving, and colored concrete for 25% of the site paving. Which of the following factors must be considered when selecting the materials for these strategies?

A.

The Solar Reflectance Index (SRI) of the colored concrete, and the unbound percentage of the open-grid pavement system

B.

The SRI of the vegetated roof system, and the unbound percentage of the open-grid pavement system

C.

The SRI of the vegetated roof system, and the SRI of the colored concrete

D.

The SRI of the colored concrete, and the SRI of the open-grid pavement system

Full Access
Question # 38

How can a building owner promote both energy efficiency and thermal comfort in a building?

A.

Survey occupants about their comfort on a regular basis

B.

Provide occupants with individual space heaters in the winter

C.

Ask the cleaning contractor to turn off all of the lights after cleaning

D.

Institute a flexible dress code that permits seasonally appropriate clothing

Full Access
Question # 39

Which of the following environmental concerns is exacerbated by impervious surfaces?

A.

Increase in light pollution

B.

Indoor Environmental Quality decreases

C.

Retention pond diminishment

D.

Contaminated runoff harming aquatic life

Full Access
Question # 40

Which of the following standards is applicable in order to comply with Indoor Environmental Quality Credit, Thermal Comfort?

A.

SCAQMD Rule #1168

B.

ASHRAE 55-2010

C.

ASHRAE 52.2-2007

D.

SCAQMD Rule #1113

Full Access
Question # 41

A building owner upgrades the building automation system (BAS) to allow programmable load control. Which of the following credits can be pursued because of the upgrade?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Ongoing Commissioning

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Existing Building Commissioning – Implementation

Full Access
Question # 42

For projects not eligible for the ENERGY STAR® rating, the project team could demonstrate compliance with Energy

and Atmosphere Prerequisite, Minimum Energy Efficiency Performance by

A.

conducting an energy audit that develops a commissioning plan for the building's major energy using system

B.

providing a program demonstrating no or low cost measures of improvement to increase energy efficiency

C.

developing a master list of findings identifying systems or pieces of equipment including the defects or problems

and proposed solutions

D.

demonstrating an energy efficiency of at least 25% better than the national average for typical buildings of similar

type based on energy source

Full Access
Question # 43

The Materials and Resources (MR) section includes which of the following building products in Credit calculations?

A.

Furniture

B.

Light Fixtures

C.

Plumbing Fixtures

D.

Mechanical Equipment

Full Access
Question # 44

What must the project team do regardless of building type for Energy and Atmosphere Prerequisite, Minimum Energy Performance?

A.

Compile meter data into daily and weekly summaries

B.

Use Labs21 Energy Benchmarking tool to calculate minimum energy performance

C.

Establish an ENERGY STAR® Portfolio Manager profile

D.

Benchmark building site energy data of at least three similar buildings

Full Access
Question # 45

The compliant value of green cleaning products and materials is calculated using what factor?

A.

Cost

B.

Weight

C.

Volume

D.

Recycled content

Full Access
Question # 46

What credit rewards customers who change their normal consumption patterns in response to the varying price of

energy over time?

A.

Energy and Atmosphere Credit, Demand Response

B.

Energy and Atmosphere Credit, Ongoing Commissioning

C.

Energy and Atmosphere Credit, Advanced Energy Metering

D.

Energy and Atmosphere Credit, Green Power and Carbon Offsets

Full Access
Question # 47

A 1,500 ft2 (139 m2) mobile home is built in the downtown area of a major city. 90% of the project's gross floor will be

completed by the time of occupancy. LEED certification is being sought. Which rating system would be the most

appropriate one to use?

A.

LEED Interior Design and Construction

B.

LEED Building Design and Construction

C.

LEED for Homes

D.

No rating system

Full Access
Question # 48

When tracking waste data during the performance period for Materials and Resources Credit, Solid Waste Management - Ongoing, which strategy may be used to document total and diverted waste?

A.

Measure and document waste in weight or volume

B.

Use replacement value as the metric for ongoing waste

C.

Extrapolate data from one month of the performance period

D.

Do not allow tenant waste outside the building's waste program to be included

Full Access
Question # 49

Which of the following is a feature of the ENERGY STAR® Portfolio Manager?

A.

Requires input of 36 months of data

B.

Requires ISO 14001 compliance

C.

Requires calculation and input of site energy usage

D.

Requires California Title 24 compliance

Full Access