New Year Special Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: mxmas70

Home > EMC > Networking > D-SNC-DY-00

D-SNC-DY-00 Dell SONiC Deploy Exam Question and Answers

Question # 4

Use the simulator to perform the following configuration task.

1. Map a single-tagged CVLAN 100 to SVLAN 200 translation on PE

switch interface Eth1/1.

2. Map a double-tagged VLAN packet with an outer CVLAN 100 and an

inner dot1q 200 to SVLAN 300 translation on PE switch interface

Eth1/2.

The necessary VLANs and VLAN stacking have already been configured.

Full Access
Question # 5

A customer must configure a peer link between two switches in the L2 MC-LAG scenario.

SwitchB has already been configured. Configure the peer link on SwitchA.

Use the following configuration information:

MC-LAG domain 1

VLAN 101

Peer link Port-Channel 100

SwitchA IP: 192.168.1.1/24

SwitchB IP: 192.168.1.2/24

MC-LAG system MAC: 00:00:00:11:11:11

The physical ports to connect the peer switch are Eth 1/5 and Eth 1/6 for each switch.

Full Access
Question # 6

Create port channel 10 on interfaces Eth 1/11 and 1/12, so that it connects to an already configured switch. A server will be connected on Eth 1/1. Both the server and port channel need VLAN 1 untagged and only VLAN 10 tagged.

Complete the configuration on Switch A.

Full Access
Question # 7

What is ECMP?

A.

A Layer 3 routing feature to forward traffic using multiple available paths

B.

A routing protocol database filter supporting a maximum of four paths

C.

A round-robin path distribution mechanism

D.

A routing protocol with multipath support

Full Access