Question # 4

An integrator has to upgrade a camera system in an existing board room. What is the MOST IMPORTANT information to gather on the site visit?

A.

cable length

B.

ambient lighting placement

C.

resolution of camera system

D.

distance from the lens to first participant

Full Access
Question # 5

Which of the following takes the highest precedence when the interpretations of applicable codes and standards are in conflict?

A.

local fire codes

B.

company guidelines

C.

national safety codes

D.

local authority that has jurisdiction

Full Access
Question # 6

Which process examines methods, techniques, and principles from peer organizations?

A.

benchmarking

B.

needs analysis

C.

space allocation

D.

end user meetings

Full Access
Question # 7

During project delivery and after completion, it is important to ensure correct management of control system code so that

A.

programming costs will be within project budget.

B.

other contractors are unable to reuse or edit code.

C.

the most up-to-date version of code is available for upload when required.

D.

sub-contract programmers submit uncompiled code as per their contract of employment.

Full Access
Question # 8

Which type of contract involves ongoing support for an AV system, regardless of the age of the facility or who did the initial installation?

A.

system warranty

B.

service agreement

C.

manufacturer warranty

D.

preventive maintenance

Full Access
Question # 9

The purchaser in an AV solutions firm has a key role to play in the area of

A.

estimating manpower availability and scheduling.

B.

coordinating project documentation and commissioning.

C.

communicating with vendors and internal staff members.

D.

reviewing the customer needs analysis to determine best solutions.

Full Access
Question # 10

Which document is used to clarify a project design issue?

A.

change order

B.

progress report

C.

request for change

D.

request for Information

Full Access
Question # 11

Network Quality of Service (QoS) is defined as

A.

the ability to prioritize the traffic in the network system.

B.

the ability to set the quantity of stations connected via the network.

C.

the ability to remotely manage network switches, routers and hubs via the network connection.

D.

a feature allowing the network administrator to monitor who is connected to the network at any given time.

Full Access
Question # 12

When is the optimal time to conduct training of end users in a new AV installation?

A.

after all participants have reviewed equipment manuals

B.

when all users of the facility can be trained at the same time

C.

at the time of system handover with accompanying user guides

D.

during installation so that the system can be configured and modified in line with the user's knowledge

Full Access
Question # 13

Which of these cables should be used for a balanced microphone signal?

A.

A

B.

B

C.

C

D.

D

Full Access
Question # 14

Constant voltage distributed audio systems utilize a_____wiring scheme.

A.

star

B.

loop

C.

series

D.

parallel

Full Access
Question # 15

As part of a service agreement offering, wfwt PRIMARY role do preventive maintenance visits (PM/PMV) play?

A.

allows the AV provider toclean, service and assess equipment In the field on a regular basis

B.

allows the AV provider to check in with customer and serves as an opportunity to sell further solutions

C.

allows the AV provider tosell a service that is often forgotten by the customer, and therefore generate greater profit

D.

allows the AV provider access to client premises and scope future work

Full Access
Question # 16

Remotely monitoring system health of a deployed conference room and rebooting it when faulty is an example of

A.

a service call.

B.

troubleshooting.

C.

a service contract.

D.

proactive maintenance.

Full Access
Question # 17

Which of the following aspects should FIRST be considered at an initial site survey for the location of AV racks?

A.

serviceability

B.

available space

C.

access route restrictions

D.

space allowance for future expansion

Full Access
Question # 18

What frequency is identified by the numbers above each slider of a graphic equalizer?

A.

center

B.

lowest

C.

highest

D.

secondary

Full Access
Question # 19

Which of the following is addressed within the Needs Analysis part of the AV Design process?

A.

creating the project timeline

B.

outlining project Bill of Materials

C.

identifying key stakeholders for the project

D.

identifying functional requirements of the project

Full Access
Question # 20

When compared to Listener 4, which listener simultaneously hears the speaker at +6db? Select the answer by clicking on the correct listener.

Full Access
Question # 21

As a project manager, daily or weekly updates from the____are MOST USEFUL when trying to make sure a job comes in on time and on budget.

A.

installer

B.

customer

C.

employer

D.

consultant

Full Access
Question # 22

According to AVIXA Standards, what is the MINIMUM load rating for truss that will hold a 5000 lbs (2268 kg) LED wall?

A.

15000 lbs (6804 kg)

B.

25000 lbs (11340 kg)

C.

30000 lbs (13608 kg)

D.

50000 lbs (22678 kg)

Full Access
Question # 23

Which of these symbols is generally used to represent a network?

A.

A

B.

B

C.

C

D.

D

Full Access
Question # 24

The bending or changing direction of a light ray as it passes through material is called

A.

scattering.

B.

refraction.

C.

reflection.

D.

dispersion.

Full Access
Question # 25

Milestones are key events or deliverables in a project. On a Gantt Chart or Network Diagram, milestones are represented by a(n)

A.

circle or oval.

B.

diamond or triangle.

C.

square or rectangle.

D.

asterisk or apostrophe.

Full Access
Question # 26

What is the MAIN difference between OLED displays and LED displays?

A.

luminosity

B.

higher brightness

C.

self-emitting light source

D.

determined screen shape

Full Access
Question # 27

The MOST important information to come away with from an initial site survey is the

A.

key decision maker.

B.

final budget for the entire project.

C.

overall scope AV solution needed.

D.

manufacturers which will be used in the AV system.

Full Access
Question # 28

A client with an open concept office space has stated a concern regarding speech privacy for workers. A possible solution for this issue is a(n)

A.

sound masking system.

B.

distributed speaker system.

C.

individual audio monitor system.

D.

audio phase cancellation system.

Full Access
Question # 29

Which of the following testing metrics would BEST be applied towards testing a distributed audio system for proper speaker wattages and cabling?

A.

Low-end system response 60 Hz and below

B.

High-end frequency response 10 kHz and above

C.

Audio uniformity in the range of intelligible speech 100 Hz - 2 kHz

D.

Audio uniformity across the entire spectrum of humanhearing60 Hz - 20 kHz

Full Access
Question # 30

What is a common vulnerability in a networked AV System?

A.

open ports

B.

using IPv6

C.

static IP address

D.

strong passwords

Full Access
Question # 31

Which one of these features has to be disabled for a network switch in a Dante network?

A.

QoS (Quality of Service)

B.

PoE (Power over Ethernet)

C.

EEE (Energy Efficient Ethernet)

D.

IGMP (Internet Group Management Protocol)

Full Access
Question # 32

The installation of a complex AV project is planned to be completed within 6 months. What is the MOST cost-effective plan for ordering the equipment for the project?

A.

Order everything as soon as the contract is signed.

B.

Place the order 5 days before the scheduled day for starting installation.

C.

Order each piece of equipment to be delivered as soon as possible.

D.

Order equipment to be delivered on a "just in time" basis according to the installation schedule.

Full Access
Question # 33

During the installation of an audiovisual system, a client states that they wish to add a videoconferencing system that was not considered in the initial scope of the project. What form is required?

A.

Request for Quotes (RFQ)

B.

Request for Change (RFC)

C.

Request for Proposals (RFP)

D.

Request for Information (RFI)

Full Access
Question # 34

During an initial customer visit, it is important to determine whether or not one is

A.

going to get the job.

B.

being competitive enough.

C.

meeting with the decision maker.

D.

going to have enough cable in stock to do the job.

Full Access
Question # 35

Project documentation states the system must logically Isolate control and media networks. What piece of network equipment should be used?

A.

router

B.

access point

C.

managed switch

D.

unmanaged switch

Full Access
Question # 36

The owner is looking for an audio solution for staff meetings. Which question is MOST important to ask to ensure a functioning system?

A.

Are there any remote participants?

B.

Will you use displays or a projector?

C.

Do you want handheld or lapel mics?

D.

Would you like ceiling or surface mount speakers?

Full Access
Question # 37

A customer wants to reuse existing network cabling to extend audio and video signals in a system refresh. What is the PRIMARY concern?

A.

cable color

B.

cable labeling

C.

cable condition

D.

cable connection

Full Access
Question # 38

Which addressing scheme is used to define a fixed, routable IPv4 address that is locally assigned?

A.

static

B.

DHCP

C.

link-local

D.

DHCP reservation

Full Access
Question # 39

What would be the BEST way to verify proper performance of a CAT cable fitted with a new termination?

A.

use a cable tester and run a protocol

B.

use a multimeter to test if the pins have a connection

C.

connect the cable to a reference unit to check against it

D.

connect the source and sync, then verify there is a picture

Full Access
Question # 40

Ambient noise PRIMARILY affects desired sound by

A.

enhancing it.

B.

canceling it out.

C.

interfering with it.

D.

complementing it.

Full Access
Question # 41

A client has ordered a large LED video wall to be installed in an existing board room. What should be the integrator's MAIN operational concerns?

A.

power and temperature

B.

brightness and contrast

C.

aspect ratio and resolution

D.

cable management and length

Full Access
Question # 42

Your client has requested a 50inch monitor be mounted on the south wail of this boardroom. Which two recessed lights will need to be separated into the r own zone in order to turn them off when the monitor is on?

A.

A

B.

B.

C.

C

D.

D

Full Access
Question # 43

The architect states that the project is in the pre-design phase. This would indicate that

A.

construction is about to commence.

B.

a needs analysis should be requested.

C.

the reflected ceiling plan has been approved.

D.

the control system is ready for implementation.

Full Access
Question # 44

When planning video content with a client, it is important to get their Pantone data (PMS) to ensure

A.

the displayed colors match printed colors.

B.

their confidence monitor size is large enough.

C.

the displayed logo is the proper size and style.

D.

the displayed type face is the correct size and style.

Full Access
Question # 45

One way to safeguard individual pieces of equipment in a rack from theft is the use of

A.

lacing bars.

B.

a rack shelf.

C.

security screws.

D.

a password.

Full Access
Question # 46

When planning to use audio equipment on a converged enterprise network, it may be desirable to separate broadcast domains in order to

A.

avoid audio feedback between devices.

B.

avoid crosstalk between multi track channel packets.

C.

avoid delaying time sensitive AV traffic on the network.

D.

comply with local electrical and telecommunication regulations.

Full Access
Question # 47

A task cannot begin before another task is completed. How is this described in a project task schedule?

A.

requirement

B.

dependency

C.

consequence

D.

determination

Full Access
Question # 48

Upon completion of hardware installation and configuration for a new deployment, the NEXT thing the AV Project Manager should have scheduled is

A.

training the client.

B.

testing and verification.

C.

invoicing and project close out.

D.

preventative maintenance schedule.

Full Access
Question # 49

What is the FIRST stage in troubleshooting an AV system?

A.

evaluating possible sources of error

B.

identifying the symptoms of the error

C.

determining which devices are fully functional

D.

reviewing the system diagram showing the connections and the signal flow

Full Access
Question # 50

Which connector is TYPICALLY used for RS232 connections?

A.

B.

C.

D.

Full Access
Question # 51

An application requires Its equipment to be operational 24 hours a day and the owner considers the system mission critical. What type of warranty would be BEST for the equipment?

A.

limited warranty

B.

implied warranty

C.

manufacturer's factory warranty

D.

advanced replacement warranty

Full Access
Question # 52

As the height of a character increases on a display.

A.

legibility increases.

B.

legibility decreases.

C.

brightness increases.

D.

brightness decreases.

Full Access
Question # 53

When designing a projection system for an auditorium, what are the PRIMARY design considerations?

A.

HVAC layout, rear projection, text height

B.

presenter position, viewing area, aspect ratio

C.

viewing cone, viewing distance, viewing angle

D.

inverse square law, screen gain, reverberation

Full Access
Question # 54

The FIRST step in troubleshooting an AV system is to

A.

clearly identify the failure symptoms.

B.

change only one component at a time.

C.

ensure that all the system components have power.

D.

divide the system in half to identify the portion that is not working.

Full Access
Question # 55

Which microphone pattern is MOST susceptible to feedback? Select the correct pattern by clicking on it.

Full Access
Question # 56

While conducting routine maintenance, an AV technician notices that there is distortion coming from the main loudspeaker. This is likely caused because the amplifier's

A.

volume is minimized.

B.

volume is maximized.

C.

input signal is clipping.

D.

input signal is showing a bouncing audio signal.

Full Access
Question # 57

A 2x2 video wall was sold with each display being Full HD resolution. Now the client wants to show live content at the best possible quality over the complete wall. Which resolution must the camera provide?

A.

1920 x 1080

B.

3840 x 2160

C.

4096 x 2160

D.

7680 x 4320

Full Access