You can pre-order your "ISTQB Certified Tester Foundation Level - Specialist Performance Testing" exam to us if you are in need this urgent. Dumpsmate.com Team will prepare your Exam Questions & Answers From Real Exam within next 2 to 3 Weeks Time only.
In the unlikely event if we can't make this exam available to you then you will issue a full refund! So there is no risk.
Select the architecture that, in addition to the virtualized systems, could present performance risks associated with virtualization.
SELECT ONE OPTION
Refer to Base Scenario 1: When you refer to Base Scenario 1, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
•The project follows an iterative and Incremental development life cycle model.
•Development approach: Agile.
Question
Which of the statement(s) below is (are) TRUE regarding how the performance test is undertaken7
1.The performance test can have a dedicated iteration in a specific way.
2.Performance testing should be performed in a cloud-based performance test environment
3.The performance test may be conducted by a specific team.
4.A performance test cycle must be performed in each iteration by the development team (Agile).
SELECT ONE OPTION
(REFER TO BASE SCENARIO 2): When you refer to Base Scenario 2, you are referring to the description and only the description, without any modification.
Question specific constraints: (specific constraints are not part of the Base Scenario and are specific to this question).
• Natalie should make a presentation to the technical stakeholders In order to explain the performance test plan.
Question
Which ONE of the following options contains information that should be included in Natalie's presentation to the technical stakeholders?
SELECT ONE OPTION
Select the option that identifies the possible causes of the degradation of a system's response over time during dynamic performance testing.
1.Disk fragmentation.
2.Network latency.
3.File repository growth.
4.Memory leaks.
5.Inadequate database design.
SELECT ONE OPTION
Identify the activity that is NOT part of the performance test preparation.
SELECT ONE OPTION
If a performance test is testing the response time of an application to be connected through remote access, which protocol is being used?
SELECT ONE OPTION
Identify the correspondences between the aspects (listed from 1 to 4) and factors to be considered(listed from A to D) when selecting performance testing tools.
1.Compatibility.
2.Scalability.
3.Understandability.
4.Monitoring.
1.Level of technical knowledge needed to use the tool.
2.Correlation of the monitoring with the defined transactions.
3.Protocols.
4.Ability to generate load from multiple points of presence.
SELECT ONE OPTION
Select the ONE option that describes the mechanism used to extract metrics associated with deadlocks and multi threading problems
SELECT ONE OPTION