Question # 4

Which of the following could lead to inconsistent performance test results?

A.

Concurrent scripts running and attempting to access the same data.

B.

Sequential scripts running and attempting to access the same data.

C.

Virtual users running the same script while logged in as the same user.

D.

Expected results were not verified with senior management.

Full Access
Question # 5

What challenge must be considered when using crowds to emulate load generation?

A.

The load generation will be difficult to reproduce.

B.

The load generation method is less sensitive to changes in the system under test.

C.

This type of load generation is more suitable for mainframe applications.

D.

This technique is more precise than other methods of load generation.

Full Access
Question # 6

Which of the following is a general principle of performance testing?

A.

Tests must be executable within the project timeframe.

B.

Test results must be comparable to tester expectations.

C.

Test results must vary when the tests are run repeatedly on an unchanged system.

D.

Tests must align with the ideal outcome of stakeholders.

Full Access
Question # 7

Stakeholders were unhappy with previous performance test results, which indicated that the adjustments were not made fast enough and engine stall was probable. The developers have now made changes that they believe will significantly improve the performance of the adjustments.

What should you do to ensure the performance test objectives have been properly defined before you run the next set of performance tests?

A.

Understand the delta between the results from previous performance tests and the results from the expected performance improvements.

B.

Adjust stakeholder expectations to be more aligned with the reality of the previous test results.

C.

Realign performance test objectives with business stakeholders to meet project milestone dates.

D.

Realign performance test objectives with all stakeholders to meet time-to-market goals.

Full Access
Question # 8

Which of the following should be a key part of your test acceptance criteria in your performance test plan?

A.

Convincing technical and business stakeholders to provide realistic performance goals for the regional servers

B.

Describing the system under test in order to provide context to the metrics

C.

Highlighting any technical differences in the hardware between the test environment and the production environment

D.

Documenting previously baselined performance metrics in order to compare these to the new performance measurements

Full Access
Question # 9

During which of the principal performance testing activities are the building blocks for larger, more complex tests created?

A.

During test completion

B.

During test planning

C.

During test design

D.

During test implementation

Full Access
Question # 10

Which of the following is a typical performance risk associated with mainframe architectures?

A.

Inconsistent loads when accessed via APIs

B.

Slow hard disk speed

C.

Misconfigured host machine

D.

Lack of RAM

Full Access
Question # 11

You are managing the testing efforts of an existing distributed system that manages inventories of automobile and light truck tires from multiple warehouses across the country. The system is being enhanced to track incoming restocking shipments at the point of entry to the warehouse and outbound sales shipments at the point of shipment from the warehouse, all of which are executed in real-time. System loads traditionally peak on Mondays due to built-up demand from the previous weekend.

You are constructing an operational profile that emulates entities that submit large, bulk orders of greater than or equal to 1600 tires per transaction. You feel the profile you are constructing accurately reflects this type of power purchaser.

Which of the following steps must you take to ensure your operational profile is accurate?

A.

Execute the performance test with the operational profile and adjust the parameters as needed.

B.

Review and adjust the profile with key stakeholders prior to using it.

C.

Aggregate the specific operational profiles into a single generic profile and use that generic profile for load testing.

D.

Based on the power purchaser information, create operational profiles for low and medium purchasers and use equal proportions of those profiles during the testing.

Full Access
Question # 12

Which of the following performance script types measures network response times?

A.

GUI scripts

B.

API scripts

C.

HTTP scripts

D.

Protocol-level scripts