CCBA Certification of Capability in Business Analysis (CCBA) Question and Answers

Question # 4

During the analysis, synthesis, and refinement of elicitation results the business analyst (BA) has discovered that some information is missing. Which course of action would resolve the situation?

A.

Verify the requirements results

B.

Conduct elicitation activities

C.

Conduct traceability analysis

D.

Validate the requirements

Full Access
Question # 5

A new payments system was recently implemented to replace an old legacy system. The system users have lodged a complaint that the new system is slower than the old system but system performance statistics show more efficiency. How does the business analyst (BA) demonstrate to users how the new system is performing?

A.

Collect system metrics and communicate results in an understandable format

B.

Identify the dependencies of the system with other applications

C.

Analyze the feasibility of including additional hardware resources to the system

D.

Evaluate the payments process to identify areas of improvement in the system

Full Access
Question # 6

One of the tasks that the business analyst (BA) needs to complete is to maintain the requirements. As much as the BA values and sees the benefits of maintaining the requirements, the project manager (PM) does not see the same. In order to help the PM understand the value of this task, which following benefit of maintaining the requirements should the BA communicate to the PM?

A.

They identify the financial projections of the project.

B.

They define the project schedule and future tasks.

C.

They describe how to setup the traceability tools.

D.

They can easily be traced and reused for future.

Full Access
Question # 7

A business analyst (BA) worked with two stakeholders to finalize the access rights related requirements for an internal software application. According to the first stakeholder “Comments, once entered in the application, should be stored for 365 days and should not allow the users to delete”. According to the second stakeholder, “The users with super administrator privileges should be able to add/delete/modify every page/section in the entire application.” Which characteristic does this pair of requirements fail to meet?

A.

Concise

B.

Consistent

C.

Complete

D.

Complex

Full Access
Question # 8

A business analyst (BA) is verifying requirements for a software solution. The BA needs to confirm that items determined to be important are included in the final requirements deliverable. Which of the following will help the BA complete this task?

A.

Checklists

B.

Requirements matrix

C.

Evaluation criteria

D.

Prioritization

Full Access
Question # 9

A company wants to increase transaction service offerings using its on-line channels. The existing application already has some of the required functionality. A new project has been initiated to implement the additional capabilities but the company management is unsure of the complexity of the project. What exercise must be carried out to determine the changes needed in the new application?

A.

Perform gap analysis of current and future states

B.

Identify internal solution component dependencies

C.

Evaluate competitor applications

D.

Assess organizational culture

Full Access
Question # 10

A business analyst (BA) is planning the requirements attributes. The BA received a long list of requirements that must be implemented in different phases. Which requirements attribute can the BA include to allocate the requirements to the proper phase?

A.

Status

B.

Author

C.

Priority

D.

Source

Full Access
Question # 11

A business analyst (BA) identifies a design option that enhances the performance of the business by automating repetitive tasks that require multiple staff touchpoints to complete a single task. Which type of improvement opportunity is identified by the BA?

A.

Identify additional capabilities

B.

Increase efficiencies

C.

Reduce costs

D.

Improve access to information

Full Access
Question # 12

A banking giant recently found a major security loophole in their online banking platform that could expose customer information. Security experts and the business analyst (BA) develop a low cost, low effort emergency fix to address this issue. What factor should the BA use to convince the bank to move forward with the emergency fix?

A.

Cost

B.

Schedule

C.

Impact

D.

Urgency

Full Access
Question # 13

Holly's organization uses a plan-driven approach to business analysis. When it comes to communication in Holly's organization what type of communication will likely be required?

A.

Face-to-face

B.

Ad hoc

C.

Chain of command

D.

Formal

Full Access
Question # 14

A change to support a regulatory requirement is proposed for inclusion in the scope of a project. A business analyst (BA) conducts an impact analysis to determine the extent of the change. What previous task could assist the BA in performing the impact analysis?

A.

Update use case scenarios

B.

Perform a risk analysis

C.

Create requirement relationships

D.

Conduct a cost-benefit analysis

Full Access
Question # 15

A business analyst (BA) is defining relationships between business requirements and solution components. Which guideline will the BA use to accomplish this?

A.

Change Strategy

B.

Solution Scope

C.

Solution Objectives

D.

Domain Knowledge

Full Access
Question # 16

When a business analyst assists in the planning of the solution implementation, she must always consider the constraints for implementation. Which one of the following cannot be considered as an implementation constraint?

A.

Weather

B.

Freeze periods

C.

Company policies

D.

Business cycle timings

Full Access
Question # 17

Wanda is the business analyst for her organization and she is currently working on the specify and model requirements process. One of the elements of this process is the documentation of the textual requirements. Wanda must describe the capabilities of the solution, any conditions that must exist for the requirements to operate, and what third component of the textual requirement?

A.

Any constraints that may prevent the solution from fulfilling the requirement

B.

Describe a situation or problem

C.

Write in the active voice

D.

Express only one requirement at a time

Full Access
Question # 18

A business analyst (BA) is working on a complex project involving many stakeholders for which the business case has been previously completed and signed off. After an organizational restructure, new stakeholders have been assigned to the project working group, but do not see the value in the project outcomes and refuse to collaborate. What is a guideline or tool the BA can use to focus stakeholders on a common goal?

A.

A business requirements document

B.

An alternate stakeholder plan

C.

A stakeholder matrix

D.

A future state description

Full Access
Question # 19

A business analyst (BA) is developing the requirements for an inventory management system. Some current accounting processes are automated but other departments like purchasing, marketing, sales and distribution departments work in isolation and have a manual process. They extensively use spreadsheets to maintain the transactions and at the end of the day the department managers manually verify and reconcile transactions before supplying the information to the accounting department. In order to verify and validate the elicited requirements, the BA will need to prepare a:

A.

single process model on automation for all stakeholders.

B.

database structure in the viewpoint of the selected stakeholders

C.

list of requirements in a spreadsheet for all stakeholders.

D.

set of process models in the viewpoint of the selected stakeholders.

Full Access
Question # 20

Requirements have been prioritized in the product backlog for inclusion in the upcoming release. One of the project team members fears that at least one requirement from the prioritization list is not finalized and still requires further analysis. Which of the following factors describe the affected requirement?

A.

Benefit

B.

Dependency

C.

Stability

D.

Risk

Full Access
Question # 21

A client wants to rehire a business analysis consulting firm for another project. The assigned business analyst (BA) developed a good rapport with the stakeholders, but delivered documents that contained lots of technical jargon that the client could not fully understand. Based on the feedback, the consulting company should:

A.

recommend a new methodology which is the latest trend in the industry.

B.

assign a different BA to the project.

C.

discuss the feedback during the brainstorming sessions after project completion.

D.

identify performance metrics before commencing work.

Full Access
Question # 22

A business analyst (BA) is eliciting requirements for a pharmaceutical distribution company with an expansion plan across many states, each with their own tools and methods. To make the requirements as re-usable as possible, what should the BA do?

A.

Make specific references to applications or departments

B.

Provide details for the requirements

C.

Describe the requirements at a high level of abstraction

D.

Limit the relationships between requirements

Full Access
Question # 23

A company wants to increase its market share in the industry and its Board has prioritized capabilities that need to be implemented to achieve the goal. The business requirements for the top priority were signed off and the solution design has been completed. Due to technical constraints, it is not feasible to implement all the requirements at the same time. What must the business analyst (BA) do to deal with this situation?

A.

Redefine the business requirements associated with each implementation

B.

Recommend a reduction in the project scope

C.

Allocate requirements to different releases

D.

Ensure all requirements are traceable using a matrix

Full Access
Question # 24

A one-location restaurant has been a huge success and the owner wants to expand into more markets. The owner wants to ensure that the quality of the food and pleasing atmosphere is maintained without introducing new variables. Working with the key members of the organization, the owner determines that training and standard processes must be defined. The owner engages a business analyst (BA) to create training materials and operating procedures based on the existing processes at the original restaurant. During this documentation, the BA identifies some opportunities for improvement. How must the BA proceed?

A.

Schedule time with the owner to review any opportunities to improve existing processes and obtain

permission to include changes before documenting

B.

Create documentation based on the observed processes because improvements are outside of the scope of the project

C.

Provide documentation of improved procedures based on the observed opportunities for then new location

D.

Perform benchmarking and market analysis to determine whether there are standard procedures in the restaurant industry that support the opportunities identified

Full Access
Question # 25

The business analyst (BA) is analyzing the formal relationships between people working in the enterprise. Which technique will the BA use to perform this task?

A.

Organizational modelling

B.

Stakeholder modelling

C.

Focus groups

D.

Functional decomposition

Full Access
Question # 26

During a requirements elicitation workshop, a stakeholder raises an issue that is outside of the project's scope. The business analyst (BA) facilitating the workshop should:

A.

note the issue in the Issue Register to be considered by the Project Manager.

B.

ignore the stakeholder's comment and proceed with the agenda.

C.

consider the issue's impact on the project and gain agreement with stakeholders on the next step.

D.

request the stakeholder to explain the issue further so that possible solutions can be discussed.

Full Access
Question # 27

A business analyst (BA) is determining the current state as part of a new project. What is an internal enterprise asset that the BA must include in the analysis?

A.

Brand name

B.

Organizational structure

C.

Business need

D.

Enterprise mission statement

Full Access
Question # 28

You have been assigned as the Project Manager for a new project that involves the development of a new interface for your existing time management system. You would like to plan the communications that need to be made during the project lifecycle. Which of the following would be a critical tool/technique to help in your communications planning?

A.

RAM Chart

B.

Affinity Diagram

C.

Stakeholder Analysis

D.

Text-Oriented Chart

Full Access
Question # 29

A project to implement shared registration procedures across multiple jurisdictions has stalled several times. The new business analyst (BA) assigned to the project used a collaborative game to elicit requirements. What effect was the BA attempting to achieve?

A.

Minimal variance from planned effort

B.

Close alignment with corporate values

C.

Stimulate teamwork in a fun situation

D.

High confidence in conclusions

Full Access
Question # 30

A business analyst (BA) is working on a project that follows incremental and iterative approaches. The BA and the stakeholders have shortlisted several user stories to be considered in the project scope. Which of the following methods would enable them to arrive at a common understanding on delivering value in the product and ranking the stories?

A.

Story decomposition

B.

State modelling

C.

Value stream mapping

D.

MoSCoW prioritization

Full Access
Question # 31

When a business analyst is using alternative generation, what should she always include as an output?

A.

The cost of all requirements, some requirements, and a few core requirements

B.

The schedule of implementation for each solution

C.

The option of doing nothing

D.

The cost of each solution

Full Access
Question # 32

If you're a business analyst and using an event-based elicitation task, such as a requirements workshop, what can be considered as essential to establish with the participants?

A.

Cost management

B.

Deadlines

C.

Ground rules

D.

Purpose of the workshop

Full Access
Question # 33

A business analyst (BA) is working on a project to improve product delivery. The issues arise during the latter stages of the delivery Freecycle and are due to poor communication of the business analysis information from the elicitation phase. As a result, a BA has ensured that the testing and training teams are identified as stakeholders on the RACI Matrix going forward. To which RAG designation should the training and testing teams be added?

A.

Consulted

B.

Responsible

C.

Accountable

D.

Informed

Full Access
Question # 34

A business analyst (BA) is defining constraints for a project. Which of the following is a valid constraint?

A.

“The solution must be implemented in six (6) months.”

B.

“The solution must increase sales by 20%.”

C.

“The solution must promote workplace safety.”

D.

“The solution must reduce support calls by 20%.”

Full Access
Question # 35

A business analyst (BA) is examining the relationships between elicited requirements on a project. What quality criteria must be satisfied when the BA is defining requirements relationships?

A.

Priority

B.

Complexity

C.

Necessary

D.

Source

Full Access
Question # 36

While planning the prioritization approach for an upgrade to a legal property application, the business analyst (BA) needs to check the organization's business policies prior to identifying the stakeholders to participate in the prioritization process. The business policies will help the BA because they:

A.

provide lessons learned from previous projects that should be incorporated into planning approach for current projects.

B.

Outline the organizational roles and responsibilities in an effort to define a prioritization approach that involves the correct stakeholders.

C.

describe industry regulations and are used to develop a framework for sound business decision making.

D.

define the limits within which decisions must be made in accordance with contracts, agreement warranties or certifications.

Full Access
Question # 37

A business. analyst (BA) is working on a project to implement a commercial off-the-shelf application for tracking customers. In an observation session with a Domain subject matter expert (SMF). the BA notes that the SME keeps separate records for the customers who are also vendors. The BA knows that the new software has a module for vendor management that would integrate the vendor and customer records. Which type of opportunity has the BA identified?

A.

Reduction of duplicate tasks performed by staff

B.

Potential to provide future value supported by the system

C.

Ability to provide greater amount of information to staff

D.

Automation to increase consistency of behavior

Full Access
Question # 38

For a new account payable (AP) solution, the solution owner has provided the business analyst (BA) with goals the AP management team would like the solution to support. To ensure the solution meets these needs, the BA documents key performance indicators (KPIs). Which of the following is an example of a KPI?

A.

“The solution will send payment notification to the account holder after successful processing

B.

“The solution will report the average number of days an account payment is outstanding”

C.

“The solution will reduce the payment processing time from three days to two days”

D.

“The solution will enable account holders to make account payments via a web form”

Full Access
Question # 39

The process of defining the business need uses one output. What is it?

A.

Feasibility study

B.

Solution scope

C.

Business need

D.

Capability gaps

Full Access
Question # 40

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex. What thing adds to the level of complexity among requirements?

A.

Relationships among the requirements

B.

Management in the project

C.

Cost and schedule constraints

D.

Stakeholders in the project

Full Access
Question # 41

By which of the following is the performance of all requirements management and communication activities governed?

A.

Business analysis plans

B.

Business analyst

C.

Project manager

D.

Project sponsor

Full Access
Question # 42

A business analyst (BA) has completed an impact analysis of a proposed change, gained approval for the change, and has updated the requirements. The project sponsor wants to be updated with an overview of the results. How should the BA communicate the results?

A.

Schedule a requirements workshop

B.

Present the requirements at a high-level

C.

Email the requirements package

D.

Create use case scenarios

Full Access
Question # 43

The project plan called for deliverables to be handed over at the end of the project. Although the client's business team was satisfied, the client's technical team was extremely resistant to this approach. What could the business analyst (BA) do to mitigate the technical team’s resistance?

A.

Escalate to project sponsor

B.

Meet with technical team

C.

Reassess the project objectives

D.

Email the business team

Full Access
Question # 44

As a candidate for the CCBA exam, you should be able to recognize the activities associated with each knowledge area. All of the following are the business analysis planning & monitoring activities except for which one?

A.

Defining and determining business analysis processes

B.

Planning how requirements will be approached, traced, and prioritized

C.

Identifying stakeholders

D.

Job shadowing

Full Access
Question # 45

Complete this sentence in regard to the level of abstraction. Requirements need to say needs to be done, not to do it.

A.

What, when

B.

Requirements, who needs

C.

What, how

D.

Requirements, how much

Full Access
Question # 46

A facilities management company has an ambitious growth plan of doubling the revenue of their office waste recycling service over the next 12 months. The business analyst (BA) plans to define the objectives and align them with the enterprise's vision, mission and goals. What element of ‘SMART’ goals would this objective refer to?

A.

Relevant

B.

Measureable

C.

Specialized

D.

Achievable

Full Access
Question # 47

A business analyst in her organization has identified all of the terminology of the solution, the acronyms the organization will use, and the nomenclature of her department where the endeavor will take place. Where should all of this information actually be stored?

A.

WBS

B.

Business analysis register

C.

Terminology register

D.

Data dictionary

Full Access
Question # 48

Which of the following are not appropriate for a plan-driven business analysis approach? Each correct answer represents a complete solution.

A.

Informal

B.

Face-to-face

C.

Ad hoc

D.

Formal

Full Access
Question # 49

As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following is an elicitation process that is a part of job observation?

A.

Identifying stakeholders

B.

Job shadowing

C.

Defining and determining business analysis processes

D.

Planning how requirements will be approached, traced, and prioritized

Full Access
Question # 50

As a candidate for CCBA, you should be able to recognize the activities associated with each knowledge area. Which of the following are business analysis planning and monitoring activities? Each correct answer represents a complete solution.

A.

Job shadowing

B.

Planning how requirements will be approached, traced, and prioritized

C.

Identifying stakeholders

D.

Defining and determining business analysis processes

Full Access
Question # 51

You are the business analyst for your organization and you're creating a data flow diagram to show how

information is input, processed, stored, and output from a system. Which element of a data flow diagram represents a process that transforms data by combining it with other data?

A.

Data flow

B.

External entities

C.

Data process

D.

Concatenation

Full Access
Question # 52

A business analyst wants to use benchmarking, but the project manager recommends against the approach. There are, as the project manager points out, several disadvantages to benchmarking. Which one of the following is not a disadvantage to benchmarking?

A.

Discovery of new approaches

B.

Time consumption

C.

Requirement of expertise of the person conducting the study

D.

Inability to produce innovative solutions

Full Access
Question # 53

A recent survey shows that a newly implemented system has features that the users have never used. Upon reviewing the survey report, the Chief Executive Officer (CEO) highlighted that the company must avoid future implementations with functionality that does not provide any business value. What must the business analyst (BA) do to ensure future requirements meet a business need?

A.

Consider business relevance while tracing requirements

B.

Choose appropriate format to communicate requirements

C.

Ensure test scenarios align to business requirements

D.

Facilitate a focus group with users to get feedback

Full Access
Question # 54

A business analyst (BA) is negotiating and resolving conflict with stakeholders to ensure they participate in the required BA activities. Which element of stakeholder management is the BA performing?

A.

Confirm elicitation results

B.

Gain agreement on commitments

C.

Monitor stakeholder engagement

D.

Plan stakeholder engagement

Full Access
Question # 55

A business analyst (BA) has elicited the following requirement; "The solution must ensure the portal response times are under 2 seconds." What requirement classification schema does this requirement belong to?

A.

Nonfunctional requirements

B.

Stakeholder requirements

C.

Transitional requirements

D.

functional requirements

Full Access
Question # 56

A business analyst (BA) has completed documenting requirements and to save time, recommends sharing the requirements document with the development team to fast-track development immediately. What issue may arise by doing so?

A.

Stakeholders may refuse the solution.

B.

Requirements metrics may not be measurable.

C.

The BA may significantly impact other aspects of the project timeline.

D.

The business need may change.

Full Access
Question # 57

In order to plan business analysis activities, you will need four inputs. Which one of the following inputs is not valid for this task?

A.

Business analysis approach

B.

Stakeholder tolerance for risk

C.

Stakeholder list, roles, and responsibilities

D.

Business analysis performance assessment

Full Access
Question # 58

An organization is engaged in an effort to streamline the online customer experience. The business analyst (BA) prepares a business analysis information package to discuss the changes the customer will experience. Which one of the following tools will assist the BA in this discussion?

A.

Context Diagram

B.

Data Dictionary

C.

Visual Prototype

D.

Business Rules

Full Access
Question # 59

The business analyst (BA) has documented the requirements for a new system and is preparing the requirements for approval. Which of the following helps ensure that requirements are fully understood and traceable?

A.

Requirements are extracted for review

B.

Requirements are properly classified

C.

Requirements are validated

D.

Requirements meet regulatory standards

Full Access
Question # 60

The business analyst (BA) assigned to support a legacy system has developed a customer survey to assess its usability. Before distributing the survey, what should the BA do?

A.

Validate the survey with the project sponsor

B.

Observe customer interaction with the system

C.

Review the risk register with the project sponsor

D.

Update the project plan to include the survey

Full Access
Question # 61

The business analysis (BA) team is evaluating a new commercial off-the-shelf (COTS) application that will be implemented in the coming months. The company has over 20 legacy systems deployed. The Chief Information Officer (CIO) is worried about the need for integration and that some key linkages are missing.

What is the BA team evaluating?

A.

Technology and infrastructure

B.

Industry standard architecture

C.

Service oriented architecture

D.

Business architecture

Full Access
Question # 62

During a project to replace an existing system, requirements for new functionality were elicited. Upon further investigation, additional types of requirements related to other features and characteristics were also identified. What can facilitate effectively understanding the different types of requirements?

A.

Fishbone diagram

B.

Classification schema

C.

Process modelling

D.

Scope modelling

Full Access
Question # 63

There are competing needs from the different business areas that will use a new system. The business analyst (BA) sets up a weekly meeting with a structured agenda to review the total effort, cost, business impact and risk of each requirement with the business leads to determine what is included in each release of the solution. What approach has the BA defined?

A.

Prioritization approach

B.

Communication approach

C.

Collaboration approach

D.

Traceability approach

Full Access
Question # 64

A business analyst (BA) is assessing risks on a project addressing the implementation of a new web portal. Which of the following would the BA classify as a project risk?

A.

Customer service ratings will increase with the new system

B.

Current infrastructure may not support increased performance

C.

Expenditures are currently below budgeted estimates

D.

Support calls will increase if the change is not performed

Full Access
Question # 65

A solution that was implemented several years ago has achieved its stated objective of consolidating data from multiple sources. However, end user feedback reveals problems and inefficiencies. What should the business analyst (BA) do first?

A.

Perform a root cause analysis

B.

Recommend corrective measures

C.

Identity any lessons learned

D.

Revise the business objectives

Full Access
Question # 66

The Chief Executive Officer (CEO) is concerned about how two client bases are going to be integrated and serviced in the newly formed company after a merger. A project has been initiated to implement a Customer Relationship Management (CRM) system for the new company that will contain the client information from both companies. What must the business analyst (BA) do to address the concerns of the CEO?

A.

Demonstrate the functionality of the new CRM

B.

Reuse requirements models from each company

C.

Ensure all regulatory requirements are documented

D.

Create merged viewpoints of the requirements

Full Access
Question # 67

A project is being initiated to enhance an on-line product because sales have declined for over a year. The company leader’s ant confident that all of the skills needed to improve the product exist within the company. By enhancing the product, sales will increase and new customers will emerge. A business analyst (BA) will help the enhancement project by first:

A.

documenting the requirements.

B.

identifying the stakeholders.

C.

implementing a suitable solution.

D.

evaluating the business need.

Full Access
Question # 68

A key stakeholder has requested an extensive range of performance measures for a replacement workflow system. A business analyst (BA) has decided to work closely with the stakeholder to validate the performance measures requested. The BA will be ensuring that the performance measures:

A.

are ether qualitative or quantitative measurements, but not both.

B.

align to industry benchmarks gathered for similar solution implementations.

C.

are written in the correct format. using the agreed standards and terminology.

D.

align with other measures within the broader context of the solution.

Full Access
Question # 69

A business analyst (BA) has completed multiple workshops involving a number of stakeholders including the project manager however, the elicitation results are inconsistent between the stakeholders. How should the variation in results be resolved?

A.

The project manager should decide which requirement is relevant.

B.

The BA should select which requirements are correct.

C.

The project manager should model requirements in a review meeting.

D.

The BA should model the elicited requirements in a review meeting.

Full Access
Question # 70

The business analysis deliverables went through a formal performance review process. The performance report stated that changes to the business analysis approach must be made in order to maximize the project's chances of success. Who must be consulted regarding these changes before they are implemented in this project?

A.

The project manager

B.

The lead developer

C.

The enterprise architect

D.

The subject matter expert

Full Access
Question # 71

A project to replace a financial system uses a waterfall methodology. Initially, meetings with the project subject

matter experts (SMEs) were positive. As the project progressed through the requirements and design phases, the SMEs attended fewer meetings, resulting in a delay to the project build phase. What should the business analyst (BA) have done to prevent the delay?

A.

Selected a different project methodology

B.

Requested new SMEs participate in the project

C.

Modified the governance structure

D.

Engaged in consistent collaboration

Full Access
Question # 72

An organization's board of directors has funded a new mobile application to support external customers. The business case was developed with emphasis on objectives to broaden the organization's brand and increase customer engagement. The business analyst (BA) is reviewing a group of user stories with the product owner. One of these user stories is: "As a customer service representative, I need to enter my time on the mobile application so that I can leave work to pick up my sick daughter from school". The product owner wants to take advantage of this opportunity to provide the staff a way to enter their time away from the office and create an interface to the Payroll application. How must the BA evaluate alignment with the existing scope?

A.

Add me functionality to the list of requirements

B.

Suggest that the story be included with a change to solution scope or be removed

C.

Ask product owner to rank this user story against the existing product backlog

D.

Review business objectives and determine potential value

Full Access
Question # 73

A new contract requires a thorough level of documentation to be developed and maintained with planned phases of reviews and authorized sign offs. Which approach fits this contract?

A.

Waterfall

B.

Agile

C.

Scrum

D.

Iterative

Full Access
Question # 74

A business analyst (BA) elicits requirements from end users for a new application, and then completes a set of use cases and use case scenarios. What should the BA do next?

A.

Identify all the roles and responsibilities

B.

Review the use case scenarios

C.

Conduct a requirements workshop

D.

Create acceptance and evaluation

Full Access
Question # 75

If an organization wants to re-use requirements, where should the defined requirements be kept?

A.

Requirements management plan

B.

Requirements repository

C.

Solution scope

D.

Project management plan

Full Access
Question # 76

What does MoSCoW mean when it comes to requirements prioritization?

A.

Must, Should, Could, Would

B.

Money, Schedule, Control, Waiting

C.

Must, Should, Could, Won't

D.

Mustn't, Shouldn't, Couldn't, Won't

Full Access
Question # 77

Which of the following defines all of the required work to satisfy the requirements of the project?

A.

Project scope

B.

Requirements envisioning

C.

Requirements foundation

D.

Product scope

Full Access
Question # 78

A business analyst (BA) working with a large insurance corporation interviewed an industry thought leader who predicted that many of the regulations currently imposed by the government will change very soon. The BA carefully documented all these inputs from the thought leader because it will impact many of the strategic initiatives of the insurance company. What specific element of requirement validation is being executed by the BA?

A.

Identify constraints

B.

Define measurable evaluation criteria

C.

Identify assumptions

D.

Evaluate alignment with solution scope

Full Access
Question # 79

The business analyst (BA) recommended a new application be rolled out in phases. After reviewing alternatives, the project sponsor agreed. What does the BA expect to achieve by this approach?

A.

Increase stakeholder engagement

B.

Maximize allocation

C.

Maximize benefits

D.

Increase process validation

Full Access
Question # 80

A new regulation is introduced that the project must comply with to remain competitive and industry compliant. Management wants to understand the effect of this new requirement on the project. What will the business analyst (BA) use to evaluate the change?

A.

Process Modelling

B.

Domain Knowledge

C.

Traceability

D.

Impact Analysis

Full Access
Question # 81

A business analyst (BA) is supporting an organization in its product launch. The BA wants to identify assumptions about the benefits resulting from the new product. What does identifying assumptions help the BA manage?

A.

Priorities

B.

Metrics

C.

Requirements

D.

Risks

Full Access
Question # 82

A business analyst (BA) is currently verifying the accuracy and consistency of information obtained from the stakeholders. The BA needs to identify additional information. What should the BA do next?

A.

Perform data modelling

B.

Conduct elicitation activities

C.

Meet with the sponsor

D.

Consult with the project manager

Full Access
Question # 83

A business analyst (BA) is planning to elicit requirements. The BA understands the scope of the elicitation and has selected interviewing as an appropriate technique. Which of the following is part of the logistics for these interviews?

A.

Relationships between elicited requirements

B.

Performance metrics

C.

Definition of the future state

D.

Participants and their roles

Full Access
Question # 84

The business analyst (BA) has traced the requirements for the interaction between a customer and the new online ordering system. Besides enabling the BA to ensure quality of the requirements to stakeholders, tracing the requirements will also enable the BA to:

A.

show all of the decision points in the business process.

B.

illustrate the relationships between relevant requirements.

C.

capture all users that will be impacted by the project.

D.

detail the inner workings of the system being changed.

Full Access
Question # 85

A business analyst (BA) is measuring solution performance of a new system. What should the BA consider to avoid skewed results and an inaccurate conclusion?

A.

Frequency

B.

Volume

C.

Currency

D.

Timing

Full Access
Question # 86

A business analyst (BA) has been asked to develop a plan to complete the associated business analysis activities for a project in which an organization is switching from a manual to an automated process for receiving payments. As the final step in developing the plan, which technique will the BA use?

A.

Surveys or QUESTION NO:naires for the current initiative

B.

Functional Decomposition for the current initiative

C.

Lessons learned from previous initiatives

D.

Process modelling from previous initiatives

Full Access
Question # 87

A senior manager wants to know at what stage the business analyst (BA) is with the requirements management process. The BA immediately sends a 600-page document with models and business rules to all stakeholders. Which best practice did the BA violate in this situation?

A.

The business rules were included

B.

The communication method was inappropriate

C.

The distribution included all project stakeholders

D.

The models were included

Full Access
Question # 88

Stakeholders initially agreed to an implementation schedule for a set of reports based on the value to business users. The development team provided a detailed estimate of the time required to develop each report based on the business requirements. What should the business analyst (BA) and the stakeholders do with the estimates?

A.

Revise the business requirements

B.

Write functional report specifications

C.

Review the priorities

D.

Analyze technical constraints

Full Access
Question # 89

After an initial project kick-off meeting, the business analyst (BA) determined that the project has a short deadline and a regulatory mandate with stiff penalties for non-compliance. The stakeholders do not want to risk missing the deadline, and management is willing to commit any amount of resources to meet the deadline. Which kind of approach is suitable for the initiative?

A.

Crystal clear development process

B.

Kanban development process

C.

Predictive development process

D.

Adaptive development process

Full Access
Question # 90

A finance manager wants to begin a new project to replace the existing expenses processing system. The finance manager feels that the current expense submission-to-reimbursement process takes too long and is substantiated by 50% more complaints regarding incorrect reimbursement amounts than the same time last year. What should the business analyst (BA) investigate first?

A.

Submission processes to determine which activities can be fully automated

B.

Business process to uncover inefficiencies and falling control points

C.

Enterprise information model to ensure definitions are still valid

D.

Finance solution vendors for inclusion in a Request for information

Full Access
Question # 91

Stakeholder requirements were approved for a business process reengineering initiative along with the creation of a roadmap.

Due to market conditions, the product roadmap is modified to move the default process to the next iteration. What should the business analyst (BA) modify in the stakeholder requirements?

  • Requirement attribute values

  • Requirement description

  • Requirement performance measures

A.

Scope model

Full Access
Question # 92

A business analyst (BA) is preparing an analysis approach to replace a 12-year-old air traffic control system. The BA aims to define the solution definition before implementation, capture the information in standardized templates, and ensure that all activities are identified first and then divided into tasks. Which approach provides the appropriate level of formality for this project?

A.

Predictive

B.

Reactive

C.

Proactive

D.

Adaptive

Full Access
Question # 93

A business owner has marked certain requirements as high priority for the upcoming release. After performing some analysis, the project team concluded that some of these requirements are not actually high priority and can be implemented in later releases. How should the project team proceed with prioritizing requirements?

A.

Change the priority of the requirements by performing are ranking

B.

Consult with the business owner to discuss possible trade-oils

C.

Implement the requirements that the project team considers important

D.

Execute the requirements that the business owner identified

Full Access
Question # 94

A business analyst (BA) is designing solutions for a set of requirements and finds that there is an opportunity to improve the operations of the business. Which of the following is an opportunity for improvement the BA could recommend?

A.

Create a solution by constructing a number of solution components to meet the requirements

B.

Enable the solutions that will satisfy the highest priority requirements and stakeholder needs

C.

Provide information to staff so they can answer customer inquiries directly themselves

D.

Purchase software that contains features that are not currently required but are included for free

Full Access
Question # 95

A business analyst (BA) has executed the last planned workshop in a series in order to verify requirements. All issues have been logged in an issues register. What technique is used to manage and resolve the outstanding issues?

A.

Requirements documentation

B.

Requirements analysis

C.

Metrics and KPIs

D.

Item backing methods

Full Access
Question # 96

A business analyst (BA) is in the process of specifying the confirmed results of a requirements elicitation workshop. Which of the following help to ensure that the correct information about the requirements is provided to the participants?

A.

Requirements architecture

B.

Stakeholder list

C.

Standard templates and syntax

D.

Roles and permissions matrix

Full Access
Question # 97

A Chief Information Officer (CIO) was discussing a solution approach for a technology project in a meeting where a business analyst (BA) was also present. Stakeholders were discussing advantages and disadvantages of each solution approach. What should be the top priority for the BA in assessing the solution approach?

A.

The trade-off and value to stakeholder

B.

The strategy alignment with the balanced scorecard

C.

The total cost of ownership of the project

D.

The strategy design options

Full Access
Question # 98

A project has experienced several schedule delays. A business analyst (BA) is assigned to the project to help get it back on track. The project manager believes that incomplete requirements are causing the missed milestones. What tool will help address the project manager's concern?

A.

Quality control checklist

B.

Communication plan

C.

Decision analysis

D.

Risk review

Full Access
Question # 99

The human resources department of an organization needs a new report. The business analyst (BA) assigned to this effort has scheduled a requirements workshop with the users. Users from the legal department have also been invited to the workshop. As the BA sets up the workshop, what can be done in advance to ensure a productive and focused workshop?

A.

Document the feedback

B.

Facilitate the workshop

C.

Create an agenda

D.

Reserve a location

Full Access
Question # 100

A business analyst (BA) wants to check the completeness of requirements defined after meeting with project stakeholders. A group of subject matter experts (SMEs) has been identified and invited to a workshop to walk through the requirements. What must the BA do to ensure a shared understanding of requirements?

A.

Align requirements to the organizational strategy

B.

Prioritize requirements according to expected stakeholders value

C.

Ensure requirements attributes are consistent for ease of access

D.

Determine the format to present the requirements to the SMEs attending the workshop

Full Access
Question # 101

A business analyst (BA) decided to capture requirements by inviting all the stakeholders to meet at an office location. After invitations were sent, it turned out that not everyone could attend this meeting because of their individual dispersed locations.

Which of the following does the BA need to adjust to handle this situation?

A.

Project stakeholders

B.

Logistics setup

C.

Elicitation scope

D.

Elicitation technique

Full Access
Question # 102

A business analyst (BA) is developing requirements for a project with a limited budget. The business owner will be prioritizing requirements so that low value requirements can be de-scoped and the project remain within budget. Which of the following should the BA take into account to facilitate prioritization and ensure business objectives are met?

A.

Data flow

B.

Functional decomposition

C.

Traceability

D.

Dependencies

Full Access
Question # 103

A software development company has a strict policy of evaluating solutions against the number of defects reported in the testing phase. This practice helps the company stay competitive and deliver better solutions. What performance measure is being practiced?

A.

Predictive

B.

Quantitative

C.

Adaptive

D.

Qualitative

Full Access
Question # 104

A business analyst (BA) is working on a data-centric IT project. The business stakeholders develop the content but do not understand the technical aspects while the IT team believes that there is no need to understand the business issues. Which deliverable will facilitate understanding between IT and the business stakeholders?

A.

Data models

B.

Data dictionary

C.

Transition requirements

D.

Non-functional requirements

Full Access
Question # 105

Bonny is the business analyst for her organization and she's making a determination from which vendor the solution should be purchased. She has identified several categories to measure each vendor's overall performance and solution. cost, schedule, experience, certification, references, and years in business. For each category, she has identified scores the vendor may earn; for example, cost is worth 25 points, schedule is worth up to 20 points, and years in business is worth up to ten points. The vendor who gets the most points in the assessment will win the contract. What is Bonny using in this scenario?

A.

Scoring model

B.

Vendor profile assessment scale

C.

Weighted scoring model

D.

Screening system

Full Access
Question # 106

There are many stakeholders that need to be involved in the allocated requirements. One of the stakeholders in the task will be responsible for verifying released and solution components. Which stakeholder has this

responsibility?

A.

Project team

B.

Project manager

C.

Operational support

D.

Tester

Full Access
Question # 107

According to the book 'A Guide to the Business Analysis Body of Knowledge', effective business analysis practices can do what to the amount of change to requirements in a stable business environment?

A.

Reduce the amount of change, but not eliminate entirely.

B.

Document the changes to requirements.

C.

Control the frequency of the change.

D.

Eliminate the change entirely.

Full Access
Question # 108

Which one of the following terms is not a business analysis planning and monitoring approach?

A.

Structured walkthroughs

B.

Decision analysis

C.

Requirements elicitation

D.

Process modeling

Full Access
Question # 109

Marcy is working with stakeholders to understand the stakeholders' needs as part of the business requirements. The stakeholders are describing their needs for new computers for their designers. The stakeholders have specifications, monitors, and software selected for the business requirements. What are the stakeholders actually defining in this scenario?

A.

Solutions

B.

Perceived problems

C.

Perceived needs

D.

Longevity

Full Access
Question # 110

The task of prioritizing requirements creates just one output. What is it?

A.

Validated requirements

B.

Requirements (prioritized)

C.

Requirements rankings

D.

Requirements assessment

Full Access
Question # 111

Which one of the following statements best describes the purpose of allocating requirements?

A.

Optimize efficiency and link to productivity.

B.

Limit the risk exposure.

C.

Maximize the business value.

D.

Increase productivity through efficiency.

Full Access
Question # 112

What does the decomposition of activities and tasks based on the work breakdown structure create for the business analyst?

A.

Activity list

B.

Business analysis plan

C.

Network diagram

D.

Project management plan

Full Access
Question # 113

An organization has two different solutions to grow its business. One project is worth $375,000 to the organization. The second project is worth $565,000 to the business. The organization can only do one of the projects and elects to do the second project for $565,000. What is the opportunity cost of this decision?

A.

$190,000

B.

$565,000

C.

$375,000

D.

$940,000

Full Access
Question # 114

You are a Business Analyst for your organization, and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. Why is it important to complete the plan business analysis approach?

A.

This task describes the amount of time needed for the business analysis approach.

B.

This task describes the amount of budget needed for the requirements elicitation.

C.

This task describes how to select an approach for performing business analysis.

D.

This task describes the processes the business analyst will or will not do based on the time and budget available.

Full Access
Question # 115

A business analyst (BA) has determined that “Product Box”, a collaboration game, will provide a fun way to engage the stakeholders when working on prioritizing the list of features. What should the BA do?

A.

Ensure buy-in from key stakeholders

B.

Send out an agenda in advance

C.

Research ideas for the new product

D.

Consider meeting logistics

Full Access
Question # 116

As a business analyst, you must identify activities in your business analysis approach. Which one of the following is useful for identifying activities?

A.

Project management input

B.

BABOK

C.

A list of deliverables

D.

WBS

Full Access
Question # 117

A business analyst is meeting with the customer of the project. The customer tells the business analyst that she can only allow the budget of $575,000 for the project. This budget is best described as what type of constraint?

A.

Technical constraint

B.

Verified constraint

C.

Financial constraint

D.

Business constraint

Full Access
Question # 118

You are the business analyst for your organization and you're preparing the solution for your organization's review and implementation. Some of the requirements of the solution, however, must be inspected by compliance officers before the project and implementation can move forward. The requirements of the inspection can be best described as what?

A.

Bottleneck

B.

Requirements

C.

Cost-negativity

D.

Constraint

Full Access
Question # 119

Fred is the business analyst for his organization. His current initiative is quite large, so Fred decides to create a high-level plan for the business analysis approach, and then to create a detailed plan for the most imminent activities. What type of business analysis planning is Fred using in this scenario?

A.

Step planning

B.

Iterative planning

C.

Cyclic planning

D.

Rolling wave planning

Full Access
Question # 120

You are a business analyst for your organization and you're working with Mary. Mary wants to know what you need to complete the process of planning the business analysis approach if you're already the business analyst for your organization. This approach helps to find out the following except for which one?

A.

Which stakeholders need to be involved in the decision?

B.

Who will be consulted regarding and informed of the approach?

C.

Who will be observed in job shadowing?

D.

What is the rationale for using it?

Full Access
Question # 121

You are the business analyst for your organization and are leading a presentation about an identified problem. This presentation will help the stakeholders to understand the problem and it will help you when you begin to elicit requirements from the stakeholders. Which type of learner learns best through the presentation of models?

A.

Kinesthetic learners

B.

Auditory learners

C.

Communication model learners

D.

Visual learners

Full Access
Question # 122

Why is it important to have a requirements signoff process for approved requirements?

A.

It formalizes the agreement by the stakeholders that the requirements are complete and accurate.

B.

It confirms that the project sponsor and the project manager are in agreement with the business analyst about the accuracy and completeness of the requirements.

C.

It holds stakeholders accountable for the cost and schedule of the requirements.

D.

It allows the project manager to begin the project.

Full Access
Question # 123

You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year. What does the $300,000 represent?

A.

Budget

B.

Constraint

C.

Solution cost

D.

Requirements

Full Access
Question # 124

There are three inputs for stakeholder analysis. Which input describes the organizational units that exist and their interactions with one another?

A.

Business need

B.

Enterprise architecture

C.

Matrix structure

D.

Organizational process asset

Full Access
Question # 125

You are a Business Analyst for your organization, and you're preparing to elicit requirements from stakeholders. You've gathered several inputs to help with the elicitation process. Which input will you use to ensure that you understand the type of information that should be elicited from stakeholders?

A.

Roles and Responsibilities

B.

Stakeholder List

C.

Business Need

D.

Risk Assessment

Full Access
Question # 126

You are the business analyst for your organization and you're working with your team to define the business problem. As part of this analysis, you've identified the adverse impacts of the problem, the benefits from a

potential solution, and how quickly the problem could be solved. What other element should you consider?

A.

Vendors input and paid solutions

B.

Competition and their approach

C.

Dataflow of the problem

D.

Underlying source of the problem

Full Access
Question # 127

Before requirements can actually be approved to be managed, what must be true about the requirements?

A.

Requirements must support the solution scope.

B.

Requirements must be approved by the technical review board.

C.

Requirements must support the requirements management plan.

D.

Requirements are governed by the requirements management plan.

Full Access
Question # 128

What type of analysis can a business analyst perform to understand the functions of stakeholders, the location of stakeholders, the tasks stakeholders complete, and the stakeholders' concerns about the solution?

A.

Technical assessment

B.

Stakeholder impact analysis

C.

Organizational assessment

D.

Operational analysis

Full Access
Question # 129

You are the business analyst for your organization and you're working to identify all of the stakeholders within your organization and outside

your organization to ensure that you've captured the correct requirements for a project. Which one of the following techniques can be best suited for identifying stakeholders?

A.

Interviews

B.

User stories

C.

Acceptance and Evaluation Criteria

D.

Risk analysis

Full Access
Question # 130

Which of the following defines all of the features and functions of the thing, solution, or service the project or organization will create?

A.

Requirements envisioning

B.

Project scope

C.

Requirements foundation

D.

Product scope

Full Access
Question # 131

You are hired as a contract project manager for Dreams Unlimited Inc. The project involves setting up ten servers and fifty client computers on the network. From past experience, you know it takes around fifteen hours to install, test, and finalize a server, while it takes only ten hours for a client. You consider these data for making an estimate of schedule of the task. Which of the following estimation techniques has been used?

A.

Bottom-up

B.

Schedule performance index

C.

Parametric modeling

D.

Analogous

Full Access
Question # 132

When do change requests generally increase in a project?

A.

Towards the beginning of the project.

B.

During the project scope management processes.

C.

During the project's launch.

D.

Towards the end of the project.

Full Access
Question # 133

All of the following are documented approaches to business analysis work except for which one?

A.

Deming's Quality Circle

B.

Six Sigma

C.

Waterfall approach

D.

Lean

Full Access
Question # 134

You are working with several business analysts to determine the solution approach for an identified problem. All of the following techniques are acceptable for identifying the solution approach except for which one?

A.

Benchmarking

B.

Brainstorming

C.

Decision analysis

D.

Risk analysis

Full Access
Question # 135

Which of the following is used as a means of validating a created, selected, or tailored business analysis approach?

A.

Process modeling

B.

Progressive elaboration

C.

Decision analysis

D.

Structured walkthrough

Full Access
Question # 136

You are the business analyst for your organization. You are working with several IT professionals to determine all of the connected systems in your organization. You are creating a mapping of the servers, workstations, printers, and other connected devices and their purposes for an analysis of how information is input, processed, stored, and output from each system. What business analysis process are you completing?

A.

Data flow diagram

B.

Data dictionary and glossary creation

C.

Prototype

D.

Networking topology mapping

Full Access
Question # 137

Kelly is the business analyst for her organization and she's identifying roles and responsibilities of the people involved in business analysis activities. Her manager has asked Kelly to create the RACI matrix to accomplish this task. What is the RACI matrix?

A.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Action, Controlled, and Informed.

B.

The RACI matrix is a roles and responsibilities chart that uses the legend of Role, Action, Controlled, and Information.

C.

The RACI matrix is a roles and responsibilities chart that uses the legend of Responsible, Accountable, Consulted, and Informed.

D.

The RACI matrix is a roles and responsibilities chart that uses the legend of Risk, Action, Cost, and Information.

Full Access
Question # 138

You are documenting the requirements attribute for your requirements management plan. Which attribute would you use if you want to identify the person who created the requirements?

A.

Absolute reference

B.

Ownership

C.

Requirements sponsor

D.

Author of the requirements

Full Access
Question # 139

Karen is the business analyst for her organization and she's reviewing the tasks within her endeavor. Several of the tasks have the characteristic that the activity will be completed with the project stakeholders, consultants, and business analyst, though this hasn't yet been approved. What is this condition of believing some things to be true about an activity without proving the validity of the belief called?

A.

Risk

B.

Assumption

C.

Constraint

D.

Boundary

Full Access
Question # 140

What type of requirements elicitation technique is the Delphi Technique?

A.

Survey

B.

Workshop

C.

Prototyping

D.

Round table

Full Access
Question # 141

You are a business analyst for your organization. Your current business analysis endeavor includes working with stakeholders who are located in offices around the world. Because these stakeholders are dispersed, what are likely to increase in this endeavor as opposed to a collocated group of stakeholders?

A.

Face-to-face meetings

B.

Communication needs

C.

Risks

D.

Costs

Full Access
Question # 142

Some of the requirements in the solution must be completed because of laws and regulations in your industry.

Management would like you, the business analyst, to rank the requirements according to the relevant laws. What type of requirements prioritization is management having you complete?

A.

Business value ranking

B.

Risk ranking

C.

Constraint ranking

D.

Regulatory ranking

Full Access
Question # 143

You need to identify assumptions as part of the assessment of capability gaps. Which of the following is an example of an assumption?

A.

The project manager believes that her project team members can program in COBOL.

B.

The software must be compatible with the current operating system.

C.

The risk in the project must be quantified.

D.

All vendors must have security clearance.

Full Access
Question # 144

What elicitation technique is best described as a study to compare the strengths and weaknesses of an organization against its peers and competitors?

A.

Brainstorming

B.

Market analysis

C.

Comparative analysis

D.

Benchmarking

Full Access
Question # 145

Shelly is the business analyst for her organization and she's working with Thomas to review the business requirements. They are discussing the identified requirements, how the requirements will transition to the operations, and the longevity of the solution. Thomas is concerned that the identified requirements may not map to the desired future state of the organization. What business analysis task is Shelly facilitating in this scenario?

A.

Acceptance evaluation criteria definition

B.

Requirements quality assurance

C.

Validate requirements

D.

Stakeholder management

Full Access
Question # 146

In order to have high quality in requirements, all of the following characteristics should exist in the requirements except for which one?

A.

Cohesive

B.

Consistent

C.

Complete

D.

Constrained

Full Access
Question # 147

Which of the following is an output of the Identify Stakeholders process?

A.

Scope baseline

B.

Project charter

C.

Stakeholder register

D.

Project scope statement

Full Access
Question # 148

A business analyst has been assigned the task of developing a model of the current state of an organization. The business analyst doesn't understand why a current state may be needed. All of the following are good reasons to create a current state model of an organization except for which one?

A.

Analyzing the current state of the organization to look for opportunities for improvement

B.

Assessing the positive and negative risks that may exist within the current state

C.

Validating the solution scope with businesses and technical stakeholders

D.

Assisting stakeholders to understand the current state

Full Access
Question # 149

Which business analysis task in the requirements management and communication domain is best described as creating and maintaining relationships among business objectives, requirements, team deliverables, and solution components to support business analysis activities?

A.

Communicate requirements.

B.

Prepare the requirements package.

C.

Manage requirements traceability.

D.

Document requirements for review.

Full Access
Question # 150

Nancy has asked you to trace a particular requirement for her. What does 'to trace a requirement' mean?

A.

Tracing a requirement means to look at a requirement and the others to which it is related. It links business requirements to components in the project's work breakdown structure.

B.

Tracing a requirement means to track a requirement from its first identification all the way to its completion to see what issues, risks, costs, quality, and defects have surrounded the requirement.

C.

Tracing a requirement means to look at a requirement and the others to which it is related. It links risk, cost, quality, and scope elements to stakeholder and solution requirements to other artifacts created by the team and to solution components.

D.

Tracing a requirement means to look at a requirement and the others to which it is related. It links business requirements to stakeholder and solution requirements to other artifacts created by the team and to solution components.

Full Access
Question # 151

In order to assess proposed solutions, business analysts will need three inputs. Which one of the following is not an input to the task of assessing proposed solutions?

A.

Solution options

B.

Requirements

C.

Risk assessments

D.

Assumptions and constraints

Full Access
Question # 152

Your organization is using a plan-driven approach to business analysis. What must you do with all of the communication documents created as part of this high-priority project that you are serving as the business analyst for?

A.

The communications management plan will dictate what will happen to the business analysis communications.

B.

All formal communication must be destroyed once the project is completed.

C.

All communications must be archived and will become part of the organizational process assets.

D.

All communications must be documented and passed onto the solution's project manager for analysis and to serve as supporting detail.

Full Access
Question # 153

Robert is the business analyst for his organization and he gathered and documented the requirements for a new solution. The stakeholders agree through informal communications that Robert has successfully captured the needed requirements for the solution. The stakeholders signoff on the requirements. What does the signoff represent to Robert?

A.

That the stakeholders agree that the requirements are constrained by time, cost, and quality.

B.

That the project can now be launched.

C.

That the stakeholders agree that the requirements are accurate and complete.

D.

That his work is done.

Full Access
Question # 154

When using a change-driven approach, the business analyst may create an initial list of high-level requirements for the initiative. This high-level requirements list is also known as what term?

A.

Requirements envisioning

B.

Project scope

C.

Product scope

D.

Requirements foundation

Full Access
Question # 155

You are the business analyst for your organization. You've believed that your solution can actually be purchased from outside vendor rather than trying to create the solution internally. You decide to ask the vendor to provide a fee for their services based on the statement of work. What document will you give the vendor along with the statement of work?

A.

Request for quote

B.

Contract terms

C.

Request for proposal

D.

Purchase order

Full Access
Question # 156

You have 83 project stakeholders from all across your organization. Some of the stakeholders, such as functional management, require weekly communication from you, while other stakeholders, such as the end users, only need quarterly progress updates. Where can you record these communication requirements based on your stakeholder analysis?

A.

Project schedule

B.

Project scope management plan

C.

Project reporting structure

D.

Project communications management plan

Full Access