CBAP Certified Business Analysis Professional Question and Answers

Question # 4

You have identified several problems that you need to track as the business analysis duties progress. You want to make certain that the identified activities are resolved.

What document elicitation technique can help in this scenario?

A.

Brainstorming

B.

Observation

C.

Interviews

D.

Problem tracking

Full Access
Question # 5

Sally is the business analyst for her organization. Sally and her business analysis team is currently using a business analysis approach to determine what the competition of her organization is offering prospective clients. She is trying to identify solutions to increase revenue by remaining competitive with the competition.

What business analysis approach is Sally and her business analysis team using?

A.

Business rules analysis

B.

Functional decomposition

C.

Focus groups

D.

Benchmarking

Full Access
Question # 6

Which of the following is NOT a component of flowchart?

A.

Forks

B.

Attributes

C.

Activities

D.

Joins

Full Access
Question # 7

You are the business analyst for your organization and are trying to determine the best solution for an identified problem. You have determined that you could create a software solution using inhouse resources for

$65,000 and with an ongoing support of $5,600 per month. A vendor offers you a quote that they can create the software for $49,000 with an ongoing support of $6,100 per month.

Which solution should you choose?

A.

Create the software if you'll keep the solution less than 32 months.

B.

Create the software if you'll use the solution longer than 32 months.

C.

There is not enough information to determine which solution is financially better.

D.

Buy from the vendor if you'll keep the solution longer than 32 months.

Full Access
Question # 8

What is the purpose of the business case?

A.

The business case helps the organization determine if they can justify the investment for the solution.

B.

The business case helps the organization determine the duration and cost of the solution.

C.

The business case helps the organization determine the cost of the solution.

D.

The business case helps the organization determine if the solution is feasible.

Full Access
Question # 9

You are the business analyst for a large software development project. There are several issues that must be resolved by certain dates or the problem will prevent the project from advancing.

What technique can you use to track problems with the requirements?

A.

Problem tracking

B.

Issue tracking

C.

RTM

D.

Baselining

Full Access
Question # 10

You have identified several stakeholders that you believe are kinesthetic learners.

Which statement best describes the kinesthetic learning approach?

A.

The learners learn best by reading and pondering.

B.

The learners learn best be experiencing the topic.

C.

The learners learn best by seeing the topic in a model or through storyboards.

D.

The learners are not interested in the topic unless they can immediately apply it to their lives or jobs.

Full Access
Question # 11

You are the business analyst for the NHQ Project. You have identified several stakeholders that need different types of information related to the requirements.

Which stakeholder would need detailed technical interface requirements?

A.

Project manager

B.

Regulators

C.

Testers

D.

Implementation subject matter experts

Full Access
Question # 12

You are the business analyst for your organization and are preparing for the conduct elicitation activity. You'll need several stakeholders' roles as you prepare for this activity in your organization.

Which one of the following stakeholders may be responsible to dictate that a specific process or technique be

followed during your requirements elicitation activities?

A.

Project manager

B.

Regulator

C.

Functional management

D.

Project sponsor

Full Access
Question # 13

What document defines the business needs, identifies key stakeholders, and describes the positive impact the solution will provide on the key stakeholders?

A.

Project charter

B.

Project scope statement

C.

Solution scope

D.

Vision statement

Full Access
Question # 14

A company has a process improvement initiative that is projected to increase revenue by $150,000 USD non- compounded per year. The budgeted cost of the initiative is $200.000 and supporting the initiative will cost

$30.000 for years two and three.

What is the projected return on investment over the first 3 years?

A.

44%

B.

73%

C.

40%

D.

51%

Full Access
Question # 15

A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of "Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".

The BA defined the following use cases:

•"Change system parameters"

•"Setup new supervisor"

•"Send mail notification"

•"Send SMS notification"

•"Send notification"

•"Pass a two-factor authentication"

The BA wants to create a Use Case diagram.

Which standard relationship should be defined between "Setup new supervisor" and "Send notification?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 16

A business analyst (BA) has been assigned to manage the ongoing stakeholder collaboration after completing a project. The BA needs to understand the stakeholders' level of satisfaction and wants to offer stakeholders an opportunity to help improve the working relationships based on this information.

Which technique should the BA use?

A.

Risk analysis and management

B.

Brainstorming

C.

Collaborative games

D.

Lessons learned

Full Access
Question # 17

An organization is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content, in many instances, multiple teams are defining the same Functionalities while other functionalities are not being defined at all. leading to unclear understanding of business requirements

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases; but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

The BA learns that formal training programs are not often devised for teams as small and diverse as this team, but still believes it is a viable solution to the training need. What type of analysis would help the BA gain approval to proceed with creating this type of training program for this team?

A.

Process

B.

Cost Benefit

C.

Business Capabilities

D.

Decision

Full Access
Question # 18

You are the business analyst for your organization and are working on organizing the identified requirements for a new solution. Nancy, your assistant in this process, says that these requirements aren't very complex. You agree but add that it's this thing that makes the overall solution complex.

What thing adds to the level of complexity among requirements?

A.

Relationships among the requirements

B.

Management in the project

C.

Stakeholders in the project

D.

Cost and schedule constraints

Full Access
Question # 19

A business analyst (BA) elicits requirements for the sales order processing of multiple product lines. Elicitation reveals that the business processes for the sales orders of most products follow similar activity patterns that have been established over a number of years. Some of the new proposed seasonal products, however, will necessitate major variations in the process flow of some departments. The seasonal products are likely to be different every year. The business needs to carefully adapt its business practices so that the significant but seasonal variations in some of the business processes for the new products are handled adequately without disrupting the processes for the other established products.

Which of the following approaches must the BA take to manage the requirements for sales order processing in the long term?

A.

Reference specific departments in the requirements for the seasonal products

B.

Reference specific departments in the requirements for the established products

C.

Use a high level of abstraction for the seasonal products to make them less subject to revision during a change

D.

Use a high level of abstraction for the established products to make them less subject to revision during a change

Full Access
Question # 20

An organization is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content in many instances, multiple teams are defining the same functionalities while other functionalities are not being defined at all leading to unclear understanding of business requirements.

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases; but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

What analysis approach must the BA use to determine changes required to address the training needs?

A.

Market

B.

Decision

C.

Root cause

D.

Future state

Full Access
Question # 21

What element of the plan business analysis process affects the business analysis duties that need to be performed?

A.

The experience of the business analyst

B.

The experience of the project manager

C.

The expected completion date of the business analysis duties

D.

The type of project or initiative

Full Access
Question # 22

Holly's organization uses a plan-driven approach to business analysis.

When it comes to communication in Holly's organization what type of communication will likely be required?

A.

Face-to-face

B.

Chain of command

C.

Formal

D.

Ad hoc

Full Access
Question # 23

You are the business analyst for your organization. You are identifying new opportunities to improve upon your existing web services. Management is open to new opportunities as long as the changes do not take more than 60 days to implement.

What type of a factor does the 60-day implementation represent?

A.

Technical constraint

B.

Schedule constraint

C.

Business constraint

D.

Assumption

Full Access
Question # 24

Which of the following meeting brings all of the potential vendors together to discuss the statement of work and the request for proposal?

A.

Contract bidding meeting

B.

Status meeting

C.

Qualified vendors meeting

D.

Bidders conference

Full Access
Question # 25

You are the business analyst for your organization and are working with Virginia on the allocation of requirements for a new solution. You have assigned Virginia the task of breaking down the solution scope into smaller components for allocation.

What technique have you asked Virginia to complete in this scenario?

A.

Decision analysis

B.

Business rules analysis

C.

Process modeling

D.

Functional decomposition

Full Access
Question # 26

You are the business analyst for your organization and you are completing the manage requirements traceability process. You are tracking the requirements to determine how the requirements are interrelated with one another and with the actual delivery of the project scope.

There are actually three reasons why the business analyst should trace requirements.

Which one of the following is not one of the three reasons why trace requirements is useful?

A.

Impact analysis

B.

Requirements coverage

C.

Requirements allocation

D.

Quality control

Full Access
Question # 27

You are the business analyst for your organization. You are currently identifying opportunities for a customer to improve their business processes. The customer wants to streamline their business efforts either through new technologies, better processes, or a combination of both. The customer demands, however, that the solution should not cost more than $300,000 to implement and support for one year.

What does the $300,000 represent?

A.

Solution cost

B.

Budget

C.

Requirements

D.

Constraint

Full Access
Question # 28

What type of a business analysis approach focuses on the rapid delivery of business value in short iterations?

A.

Risk-driven

B.

Change-driven

C.

Risk-laden

D.

Profit-driven

Full Access
Question # 29

You are the business analyst for a large project that will create new software for the entire organization. This new software will affect all of the administrative assistants in the organization schedule meetings, reserve facilities, and share calendars. There are approximately 2,400 administrative assistants in your organization and not all of these people can attend requirements gathering workshops.

What approach can you use to manage and gather requirements from these 2,400 administrative assistants?

A.

You can meet with a small group of administrative assistants and assume their requirements are reflective of the remaining group of administrative assistants.

B.

You will need to meet with all of the administrative assistants as part requirements elicitation.

C.

You can meet with a small group of administrative assistants that will serve as representatives for the remaining administrative assistants.

D.

You can meet with the administrative assistants' managers.

Full Access
Question # 30

A solution implemented three months ago has decreased performance as the volume of transactions has increased. A business analyst (BA) is tasked with analyzing the performance of the application and providing recommendations.

What actions does the BA need to take?

A.

Develop new performance metrics

B.

Complete a decision analysis

C.

Perform a root cause analysis

D.

Re-analyze the current performance metrics

Full Access
Question # 31

A major manufacturer of popular beverages has appointed a local distributor to serve a specific territory. The demand for the beverages has a pronounced seasonal pattern. The distributor performs well overall, but is repeatedly unable to keep up with fulfilling many customer orders during peak demand periods. The distributor's current delivery capability is stretched to deliver 60 tons of merchandise per day whereas the season's peak demand periods need a daily delivery capability of up to 100 tons.

The distributor is under pressure to fully meet the year-round market demand in order to stay in business. The distributor's management wants to identify and consider more cost-effective options as resorting to adding more trucks and drivers would not be economically feasible.

A business analyst (BA) has spent several days observing and measuring the warehouse activities to understand the situation and to gain insights into possible solutions. The delivery workflow is a four-step process: (1) picking the orders and assembling them on trays, (2) bringing the trays to the loading bay, (3) loading the orders into trucks, and (4) delivering the orders to customers. As the following table illustrates, overall performance depends is dependent on five major resources: (1) the workers who pick the orders and load them into trucks, (2) the tallyers who check the orders, (3) the drivers, (4) the trucks, and (5) eight loading bays (LBs).

Each truck can only make two trips a day. The BA has noticed that only 30% of trips have their orders available for loading when a truck arrives. Otherwise the truck has to wait one extra hour until the orders are picked and brought to the loading bay.

If trucks are the only constraint, approximately how many hours are lost due to this downtime?

A.

18 hours

B.

20 hours

C.

15 hours

D.

17 hours

Full Access
Question # 32

Which of the following is NOT a component of an entity relationship diagram?

A.

Attributes

B.

Relationships

C.

Forks

D.

Entities

Full Access
Question # 33

One of the processes within requirements analysis is to prioritize requirements.

As a business analyst why would you ever want to prioritize requirements?

A.

You may need to determine the cost of each requirement.

B.

You may need to determine the schedule for each requirement.

C.

You may need to determine which requirements are most critical so the analysis and implementation efforts focus on the most critical requirements.

D.

You may need to determine which requirements are most critical so additional risk analysis can be completed on those requirements.

Full Access
Question # 34

Which conduct stakeholder analysis technique identifies stakeholder roles that may serve as a useful starting point for identifying actors and roles?

A.

Scope modeling

B.

Requirements workshops

C.

Scenario and uses cases and user stories

D.

Interviews

Full Access
Question # 35

Which solution scope technique can help the business analyst understand the scope of the work by breaking down the scope into smaller work products?

A.

Interface analysis

B.

User stories

C.

Functional decomposition

D.

Scope modeling

Full Access
Question # 36

You are the business analyst for your organization and you are preparing the business case for a proposed solution. You need to include the management horizon in your business case.

What is the management horizon?

A.

It is the expected deliverables that will be beneficial for the organization.

B.

It is the point in time when the solution will be completed.

C.

It is the duration of each phase of the project until the solution earns a profit.

D.

It is the point in time for the solution to break even on cost and begin earning a profit.

Full Access
Question # 37

You are the business analyst for your organization. You are coaching Tom about the different approaches to business analysis.

Which type of business analysis approach has the most business analysis work at the beginning of the project or during the start of a project phase?

A.

Change-driven approach

B.

Value-driven approach

C.

Plan-driven approach

D.

Requirements-driven approach

Full Access
Question # 38

Ben is the business analyst for his organization. Ben is currently working on a solution to improve a laser printer. He has taken the laser printer apart, identified each component, and documented each component's purpose.

What type of requirements organization is Ben doing in this scenario?

A.

Process modeling

B.

Data modeling

C.

Functional decomposition

D.

Scope modeling

Full Access
Question # 39

Which of the following is a procurement document?

A.

Project Work Breakdown Structure

B.

Project charter

C.

Vision document

D.

Invitation for bid

Full Access
Question # 40

You are the business analyst for your organization and are currently with several key stakeholders as part of the determination of which business analysis approach is most appropriate for the current project.

Which one of the following is not a stakeholder that is considered when completing the business analysis planning and monitoring task to determine a business analysis approach?

A.

Tester

B.

Project manager

C.

Regulator

D.

Functional management

Full Access
Question # 41

Which of the following techniques involves determining and documenting the variance between business requirements and current capabilities?

A.

Risk analysis

B.

Schedule analysis

C.

GAP analysis

D.

Cost benefit analysis

Full Access
Question # 42

Fred's organization is using a plan-driven approach for the business analysis deliverables.

In this approach how will the requirements be captured?

A.

Fred will use the appropriate documentation at the discretion of the business analysis team.

B.

Fred will use the project management information system.

C.

Fred will use whatever business analysis forms are most appropriate.

D.

Fred will use standardized templates.

Full Access
Question # 43

Your organization is trying to determine which one of two opportunities they will pursue. The Project A is worth

$235,987 and Project B is worth $567,000 but carries significant risk. The organization elects to purse Project B and not Project A.

What is the opportunity cost in this scenario?

A.

$331013

B.

There is not enough information to know as the risk for Project B has not been quantified.

C.

$235,987

D.

$567,000

Full Access
Question # 44

You are the business analyst for your organization. Gary and Janet, two key stakeholders in the project, are in disagreement over a requirement for the type of software to be installed on the server your solution calls for.

What must happen in this instance before formal approval can be offered?

A.

The conflict will need to be resolved through research, resolution, or through a third-party mediation.

B.

Gary and Janet will need to determine who has seniority in the company to determine which requirement takes precedence.

C.

The conflict will need to be removed from the solution scope until Gary and Janet come to a solution.

D.

The business analyst will need to make a decision on which requirement is most appropriate.

Full Access
Question # 45

Which of the following models demonstrates the attributes, operations, and relationship to entities within the solution?

A.

Entity Relationship

B.

Data dictionary

C.

Class model

D.

CRUD matrix

Full Access
Question # 46

When an organization is using a change-driven approach to business analysis, how are communications managed?

A.

Communications in a change-driven approach to business analysis focus more on the frequency of communication.

B.

Communications in a change-driven approach typically use face-to-face channels.

C.

Communications in a change-driven approach focus more on formal communications.

D.

Communications in a change-driven approach are all ad hoc.

Full Access
Question # 47

Which one of the following terms is not a business analysis planning and monitoring approach?

A.

Structured walkthroughs

B.

Decision analysis

C.

Requirements elicitation

D.

Process modeling

Full Access
Question # 48

Paul has been asked to complete SWOT analysis for his solution scope. What does SWOT analysis mean?

A.

Strengths, Weaknesses, Opportunities, Time

B.

Stakeholder Weaknesses, Organizational Threats

C.

Stakeholders Weaknesses, Organization, Threats

D.

Strengths, Weaknesses, Opportunities, Threats

Full Access
Question # 49

A business analyst (BA) works for an organization that is moving from a waterfall methodology to an agile approach. This causes new challenges and opportunities for the BA.

Which business analysis planning and monitoring element is most impacted by the organization's change?

A.

Timing of business analysis work

B.

Conflict and issue management

C.

Technology and infrastructure

D.

Solution scope

Full Access
Question # 50

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The BA is working on identifying additional improvement opportunities based on these requirements. Which of the following improvement opportunities is reflected in Requirement ID NFP0002?

A.

Additional capability

B.

Increased efficiency

C.

Defined relationship to information

D.

Improved access to information

Full Access
Question # 51

A business unit of a transnational manufacturer wants to implement a robust process for addressing integrity- critical equipment deterioration incidents. Timely and complete resolution of such incidents is vital for the business unit’s continuous safe and profitable operation. Treating each incident involves many employees from different departments extensively collaborating and exchanging information. That information is spread across multiple systems having their access limited to particular user groups. With the current manual process, some incidents get forgotten and remain unresolved for years.

The project’s Sponsor is an Equipment Integrity and Reliability Advisor, who moved into this position from another business unit. That business unit implemented a proprietary application to integrate the information and to assist in tracking and managing the incidents. Having a positive experience with the application, the Sponsor is suggesting to customize it and reuse in the new business unit.

The business unit’s Enterprise Architect (EA), who is responsible for assessing solution options and presenting them to executive decision makers, has a few concerns with adopting the existing application. The application uses point-to-point interfaces with other data sources whereas the business unit’s target architecture relies on a data warehouse-based integration. Moreover, the two business units use different legacy systems, as well as different front-end implementation technologies. Additionally, the existing application is monolingual, while the business unit needs user interfaces and some data to be presented in two languages. With all of this, it may be easier to build a new application from scratch than to customize the existing one. To understand which option is better, the EA asks a business analyst (BA) to define business requirements.

The EA wants to understand whether the integration capabilities of the existing solution match the business unit's IT landscape. The requirement definition that the EA needs should read as, "Each record of an incident shall."

A.

be associated with the unit of equipment to which it belongs."

B.

include the associated equipment's information from the asset management system."

C.

contain the ID of the equipment to which it belongs."

D.

be related to a unit of equipment using the Equipment ID stored in the asset management system."

Full Access
Question # 52

A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.

The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution

consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.

The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.

What should define the timing of business analysis work in this project?

A.

Buy-in of the proposed solution

B.

Approach used by the previous deployments

C.

Availability of solution consultants

D.

Overall project schedule

Full Access
Question # 53

A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst

(BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.

Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.

By proposing this change, what type of view did the BA use to analyze the current manufacturer's state?

A.

Data-centric

B.

Capability-centric

C.

Process-centric

D.

People-centric

Full Access
Question # 54

A very large insurer of General Liability and Property Damage insurance has an upward trend of increased claims over the past 5 years.

The Risk Control Area for that company has just completed a 12 month Pilot of a new improved Risk Control Site.

The purpose of the site is to help their customers manage their exposures and ideally prevent them from having claims There were 100 customers that were part of the Pilot that represented 25 different industries. The business goals were to increase use of the site and provide tools to help customer awareness of their exposures, so that they may reduce existing exposures and ultimately reduce claims.

The sites Features were as follows:

* Improvements to the search engine to all customers to search for articles, tools and services on the site

* A checklist function that allow customer to create their own unique Checklists or utilize a sample provided by ABC company to use daily, weekly etc for an area of their facility.

* A promotion feature - where Risk preventing Articles, and tools on the site are marketed toward a customer.

* A profile section allowing for Customer Name, Address and contact Phone number.

Alter the 12 month pilot the business sponsor received an assessment of what was working and what was not. The Assessment of the pilot revealed overall site activity had significantly increased, however only 5% of the time the promotions were viewed. And the most shocking was that total claims increased by nearly 20% for these 100 customers during the pilot period. The business sponsor was perplexed as he had an expectation of reduced claims and at least for 30% viewing of promotions since the project team had spent a lot of careful time and effort on this feature. A BA was assigned to do further analysis regarding the low use of the promotions and why claims were not being reduced.

Regarding the use of promotions the BA looked into other similar companies to see what they did differently to get their customer to look at their promotions. The BA found that similar companies had promotions that targeted the industry the customer was in so it was more relevant to them and they were more interested to view the promotion. In addition the BA sent out a survey to all 100 pilot customers asking probing questions about what they thought of the site and if they felt it had decreased their exposure to risk sufficiently. The Survey responses came back with raving positive comments and providing examples of how the site had been helping in the reduction of claims from the customer's perspective. In addition the survey also revealed insight that the customers found the promotion often irrelevant to their industry.

The BA asked for a dump of all documentation of the 1000 claims that were filed over the 12 month pilot period. The BA found the nearly 90% of the claim filed were all in one region of the country and were all for property damage related to several severe winter storms in the region and the claims were nearly all unavoidable by the customers. The BA brought all this analysis back to the business sponsor and made the recommendation to the business sponsor to require the customer to select 1 of 25 industries in their profile. This would in turn allow for the ability to show industry specific promotions and promote search results relative to a customer's industry to be sorted at the top giving the customer a more personalized experience.

What technique led the BA to the source of the increase in claims?

A.

Document analysis

B.

Data mining

C.

Survey

D.

Decision modelling

Full Access
Question # 55

An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.

Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.

A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:

•Total annual premium the customer has with the company (Financial worth)

•Time with the insurance company (Loyalty)

Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

If within the first six months, customer retention increased by 5 % and sales increased by 6%, then when will the desired sales and retention goals be achieved assuming the trend continues at the same pace?

A.

Sales – 2 years; Retention – 18 months

B.

Sales – 3 years; Retention – 1 year

C.

Sales – 2.5 years; Retention – 2 years

D.

Sales – 18 months; Retention – 1 year

Full Access
Question # 56

A business analyst (BA) is working on a payment system (PS) implementation. A set of systems which should interact with a new system has been identified. The business analyst defined that a user with role of "Supervisor" in the PS must pass a two-factor authentication before an execution of the functions: "Change system parameters" and "Set up new supervisor." A user must have the role of "Supervisor" to use the standard functions "Send mail notification" or "Send SMS notification".

The BA defined the following use cases:

•"Change system parameters"

•"Setup new supervisor"

•"Send mail notification"

•"Send SMS notification"

•"Send notification"

•"Pass a two-factor authentication"

The BA wants to create a Use Case diagram.

What standard relationship should be defined between "Change system parameters", "Setup new supervisor" and "Pass a two-factor authentication"?

A.

Option A

B.

Option B

C.

Option C

D.

Option D

Full Access
Question # 57

Company A is a nation-wide leader in commercial demolition. Having just celebrated its 100th year of operations, the company decided to begin doing work internationally. The current system used for reporting company finances is unable to keep pace with the potential demands of doing work in geographically dispersed locations. Therefore, the company decided to replace its client-based Profit & Loss (P&L) reporting system with a more robust, web-based system. This will ensure transparency across the organization and enable better decision making.

The business analyst (BA) at Company A has recently completed several rounds of elicitation to determine the requirements for the new, web-based system. Over 1250 requirements were elicited. An initial Requirements Traceability Matrix (RTM) has been drafted, and a subset of the RTM can be seen below:

The BA will create a Data Model to meet which requirement?

A.

Requirement ID F-R0002

B.

Requirement ID FE10001

C.

Requirement ID NFP0002

D.

Requirement ID F-R0003

Full Access
Question # 58

A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper based process A few years ago, the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements The company stopped the effort and incurred a $500,000 USD loss on the cost of the software.

This year, the Director of Finance requested that a team investigate the current paper based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder. The Director of Human Resources is still bitter about the last effort because the process stopped'.

During a brainstorming session on improvement opportunities, the Director of Human Resources repeatedly interrupts the group and states why the proposed ideas will not work.

Which approach should the business analyst (BA) take to refocus the group?

A.

Continue the activity with the group and provide a report

B.

Reschedule the session without the Director of Human Resources

C.

Pause the activity and reiterate the rules to the entire group

D.

Ask the Director of Human Resources to observe instead of participate

Full Access
Question # 59

During requirements review, the implementation subject matter expert (SME) identified the requirement 'parsing of data' that must be implemented before other requirements. The business analyst (BA) has given this requirement high priority.

What factor influenced the prioritization of the requirement?

A.

Data Dictionary

B.

Constraint

C.

Dependencies

D.

Risk

Full Access
Question # 60

A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.

The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.

The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.

The solution consultants have composed a spreadsheet with all requirements that are already implemented in the solution. The requirements in the catalog are organized partially by user tasks and partially by system features. The branch has distinct definitions of PGA user roles and uses a different approach to structuring requirements specifications.

How should the BA organize the customization requirements?

A.

Devise a structure that best fits the branch's definition of user roles

B.

Explore and apply best practices for specifying this type of requirements

C.

Reuse the structure of the solution consultants' requirements catalog

D.

Use the structure of requirements suggested by the corporate standard

Full Access
Question # 61

An insurance company wants to increase sales by 15% and customer retention by 10% within 1 calendar year.

Various strategies to achieve this were considered and a restructure to the existing pricing model is selected to help achieve these goals.

A business analyst (BA) works with stakeholders such as actuaries, product specialists, sales staff, risk managers, and underwriters who agree to applying varying levels of discounts to customers based on:

•Total annual premium the customer has with the company (Financial worth)

•Time with the insurance company (Loyalty)

Various financial models are considered but the stakeholders agree that an initial applicable discount is determined based on the customer's overall premium:

The percentage of the maximum possible discount available to the customer is adjusted based on time with the company:

As the new pricing structure was being implemented, the chief executive officer (CEO) of the company wanted to change the premiums and associated discounts offered to customers. The BA investigated the cost, anticipated benefits and the length of time the change would likely take to complete before presenting the results back to the CEO.

What type of analysis has the BA just conducted?

A.

Impact

B.

Capability

C.

Market

D.

Document

Full Access
Question # 62

A business analyst (BA) wants to estimate the potential value delivered by a set of requirements and design options by targeting a small group of stakeholders to understand their perceived value and expectations. The BA is going to organize a discussion during which feedback is collected.

Which technique will be used?

A.

Focus Group

B.

Brainstorming

C.

Survey

D.

Group interview

Full Access
Question # 63

Most users of a pilot application have experienced more efficient processing compared to the old system. However, the business analyst (BA) has observed that a few people took much longer to complete the process. The system event log shows that those users encountered errors when they attempted to sign on.

Which of the following would the BA recommend to improve overall performance?

A.

Sent a reminder to all users of their user ID and password

B.

Automate the login process

C.

Gather more information from the individuals who had errors

D.

Extend the pilot to more people

Full Access
Question # 64

As part of identifying an enterprise's capability to adopt a potential solution, a business analyst (BA) is reviewing existing processes and tools within the enterprise for their ability to adapt to a new solution.

Which of the following assessments is the BA performing?

A.

Stakeholder

B.

Enterprise

C.

Organizational

D.

Operational

Full Access
Question # 65

During a prioritization meeting, a business analyst (BA) mentioned that the access management system requirements are not stable. The project manager and a team lead proposed removing the requirements from discussion. A domain subject matter expert (SME) insisted on making that requirement a high priority, because it is really important from their point of view.

What should the BA do?

A.

Make the requirement a lower priority to minimize unanticipated rework and wasted effort

B.

Set the requirements at a high priority to adhere to the SME's point of view

C.

Remove the requirement from the project

D.

Leave priority unfilled for these requirements

Full Access
Question # 66

An organization Is trying to streamline its current processes to improve performance and reduce costs. A business analyst (BA) conducted a process improvement workshop and identified the following issues as the top three items to be addressed:

1: There are multiple teams to define systems, functionality, and content in many instances, multiple teams are defining the same functionalities while other functionalities are not being defined at all leading to unclear understanding of business requirements

2: Product specification forms are published each year. A comparison tool is used to evaluate specification differences between yearly releases, but does not adequately identify changes between versions and needs to be improved.

3: Training consists of a new team member shadowing a seasoned team member. There are no written training materials or formal training sources therefore training is inconsistent and not meeting the needs of the organization.

Which stakeholders would the BA interview to determine the changes needed to the comparison tool?

A.

Regulator and Operational Support Manager

B.

Implementation Subject Matter Expert and Tester

C.

Domain Subject Matter Expert and End User

D.

Project Manager and Project Sponsor

Full Access
Question # 67

A non-profit utility company has 900 employees, a majority of whom are hourly employees and must track their time using a paper based process. A few years ago, the Director of Human Resources purchased a software system to eliminate the current paper-based time reporting process. No requirements specific to the utility company were defined prior to the purchase. A team was formed to implement the software During implementation process, the team discovered the software lacked functionality and was not robust enough to support the general ledger requirements The company stopped the effort and incurred a $500,000 USD loss on the cost of the software.

This year, the Director of Finance requested that a team investigate the current paper-based time reporting process and recommend solutions. The Director of Finance feels that the Director of Human Resources must be involved as a critical stakeholder. The Director of Human Resources is still bitter about the last effort because the process stopped'.

Which of the following is included in performing a stakeholder analysis?

A.

Compare the expertise of the Director of Human Resources to other stakeholders

B.

Recommend excluding the Director of Human Resources as a stakeholder

C.

Develop a risk plan to anticipate negative behavior from the Director of Human Resources

D.

Implement all of the Director of Human Resources suggestions to relieve tension

Full Access
Question # 68

A national branch of a global company is struggling to improve business processes of its Public and Government Affairs (PGA) department. To work with external stakeholders effectively, PGA employees need to collect, manage, and exchange a vast amount of information. Complex cases involve collaboration of many employees from different departments. The ability to share information and to coordinate corresponding activities is crucial for the company's growth plans. Their current tools and practices do not serve the purpose well. The existing system, which was deployed a couple of years ago, has only a few active users. The majority of PGA employees avoid using it because the system is hard to use and lacks needed functionality. Consequently, available information is mostly unstructured and stored either locally or on a shared network drive. Some of the information exists only in a paper form.

The branch's PGA head, who sponsors the project, wants to implement a configurable solution that two other branches successfully deployed several months ago. Both deployments were done by three solution consultants, who will be available to assist in the project. They will be responsible for tailoring the solution to PGA needs, as well as for training the PGA staff. With their help, the sponsor plans to complete the project in approximately three months.

The solution consultants reside in another country 7 hours ahead of the rest of the project team. They will be available part-time, but are planning two one-week long trips to the PGA central office to conduct initial training and to participate in the final deployment of the system into production. The consultants, in turn, expect a business analyst (BA) to assist in collecting necessary data and defining customization requirements.

A BA suggests interviewing employees to elicit user requirements and then performing a gap analysis to identify solution customization requirements. However, the sponsor believes that it will be a waste of time because the employees do not know how the process should work in the future. The sponsor expects the solution to help shape their process and wants to start with the solution as is, amending it as necessary based on the user feedback.

What should the BA do?

A.

Deploy the current solution and survey users for improvement proposals.

B.

Utilize the solution in a test environment with actual data to elicit feedback.

C.

Collect the requirements from the sponsor and domain subject matter experts.

D.

Explain the benefits of interviews to the requirements elicitation process.

Full Access
Question # 69

A business unit of a transnational manufacturer wants to implement a robust process for addressing integrity- critical equipment deterioration incidents. Timely and complete resolution of such incidents is vital for the business unit’s continuous safe and profitable operation. Treating each incident involves many employees from different departments extensively collaborating and exchanging information. That information is spread across multiple systems having their access limited to particular user groups. With the current manual process, some incidents get forgotten and remain unresolved for years.

The project’s Sponsor is an Equipment Integrity and Reliability Advisor, who moved into this position from

another business unit. That business unit implemented a proprietary application to integrate the information and to assist in tracking and managing the incidents. Having a positive experience with the application, the Sponsor is suggesting to customize it and reuse in the new business unit.

The business unit’s Enterprise Architect (EA), who is responsible for assessing solution options and presenting them to executive decision makers, has a few concerns with adopting the existing application. The application uses point-to-point interfaces with other data sources whereas the business unit’s target architecture relies on a data warehouse-based integration. Moreover, the two business units use different legacy systems, as well as different front-end implementation technologies. Additionally, the existing application is monolingual, while the business unit needs user interfaces and some data to be presented in two languages. With all of this, it may be easier to build a new application from scratch than to customize the existing one. To understand which option is better, the EA asks a business analyst (BA) to define business requirements.

With the team ready to consider design options, they are reviewing the following requirement: "Appropriate stakeholders shall be timely and reliably notified on incident-related events."

What quality criteria does this requirement fail to satisfy?

A.

Consistent

B.

Complete

C.

Atomic

D.

Understandable

Full Access
Question # 70

A business analyst (BA) is working on an initiative to decommission a legacy system and has discovered the requirement ‘’Ability to view policies created m the legacy system for a period of 6 months. ’’How should the BA classify the requirement based on the requirements classification schema?

A.

Functional Requirement

B.

Transition Requirement

C.

Non-Functional Requirement

D.

Business Requirement

Full Access
Question # 71

Several commercial-off-the-shelf (COTS) software packages exist that would enable the business analyst (BA) to meet the needs of the business. For the potential deign options, the Ba included one of the COTS packages as a solution approach What kind of solution approach is this?

A.

Outsource

B.

Exploit

C.

Create

D.

Purchase

Full Access
Question # 72

A company wants to develop a product roadmap to guide future development efforts. The product owner asks a business analyst IBA) to lead the analysis effort. Feature suggestions have been compiled from customer support calls. Which of the following should the BA do first?

A.

Compare the Implementation costs of each feature

B.

Determine the value of each feature

C.

Prioritize the features in the backlog

D.

Confirm the feature requests

Full Access
Question # 73

A business analyst (BA) is eliciting requirements to automate existing manual processes for fulfilling end users service requests. There is pressure from management to automate the process quickly using a commercial off-the-shelf (COTS) tool. The COTS solution has various modules including one for service request automation that has yet to be implemented in the organization. What e the BA's first step?

A.

Perform a gap analysis to understand missing capabilities

B.

Implement the COTS tool's modules

C.

Modify the COTS tool to fit the existing process

D.

Create a change strategy

Full Access
Question # 74

Following a recent, successful deployment a business analyst (BA) has noticed that several of the requirements are candidates for reuse in multiple, upcoming change initiatives. Which type of requirement is a potential candidate for re-use?

A.

Transition requirements

B.

Stakeholder requirements

C.

Business requirements

D.

Non-Functional requirements

Full Access
Question # 75

A business analyst (BA) finds that the proposed solution has features used by a small group of stakeholders for business scenarios which may occur up to three times a year Out require a high effort to implement. What should the BA recommend in this cast?

A.

Change the related business process

B.

Remove the requirement

C.

Assign it a lower priority for future release

D.

Deliver as part of the initial release

Full Access
Question # 76

Before investing further in the project, a customer and the key stakeholders of the project want to be able to visualize the final product. Which elicitation technique should the business analyst (BA) select?

A.

interface Analysis

B.

Reverse Engineering

C.

Observation

D.

Prototyping

Full Access
Question # 77

During a retrospective, the project team agrees the way they organized the user stories during the first sprint could be improved. The business analyst (BA) plans to make the stones more accessible going forward. Which of the following will the BA update?

A.

Business analysis performance assessment

B.

Information management approach

C.

Organizational performance standards

D.

Project lessons learned register

Full Access
Question # 78

The project manager wants to have the requirements analysis phase approved and asks the business analyst (BA) if this is possible The BA wants to ensure that the requirements package

A.

Solution functional capabilities

B.

Business analysis approach

C.

Solution performance measures

D.

Business analysis information architecture

Full Access
Question # 79

The business analyst (BA) works in a global company and the majority of stakeholders are located in different countries The BA already explained the core requirements during the initial meetings. However due to the time zone differences it has been cumbersome to organize further meetings. What method should the BA use so the stakeholders can review the document before final approval?

A.

Group collaboration

B.

Brainstorming

C.

E-mail

D.

Collaborative games

Full Access
Question # 80

A business analyst (BA) is assessing tie different solution proposals. What type of financial calculation would the BA use to determine which solution is worth investing in based on its breakeven point?

A.

Discount rate

B.

Net present value

C.

Return on investment

D.

Internal rate of return

Full Access
Question # 81

What is the increased cost in Scenario 2 for Company C?

A.

$453.635

B.

$207.790

C.

$653.934

D.

$695.448

Full Access
Question # 82

The table illustrate the statement of cash flower for a courier company for the last fiscal year:

Due to aggressive market competition the management of the company performed a strategy review and based on their0-findings and the current market conditions, they came up with strategic and tactical changes in order to keep a competitive market position.

In order to strength customer retention strategies through a new competitive advantage, the company is considering implementing a live parcel tracking system. The added value will be that the customers may determine the exact location on of the parcel whether it is in a warehouse, crossing the ocean through an overseas the exact location of the parcel whether it is in a warehouse, crossing the ocean through an overseas the ship, or travelling in a delivery truck at any time. The system tracks the location of the parcel by tracking the vehicle in which it is contained. However, for a group of old delivery trucks, it was noticed that the engine sound and vibration disturbed the tracking signal and caused of management would like to sell these vehicles and replace them with newer ones, the Chief Financial Officer (CFO) was strongly against that approach. The CFO argued that instead of hanging tracking devices on the trucks body they can have the truck drivers manually send the truck send the truck location from a hand-held mobile device every 20 minutes.

What could the business analyst (BA) do to gain consensus between the CFO and other Management?

A.

Calculate the costs incurred by each option

B.

Recommend and present a completely new option

C.

Compare each option against an industry benchmark

D.

Estimate the potential value delivered by each option

Full Access
Question # 83

A customer has provided a business analyst (BA) with many business requirements and some have inter-dependencies with other requirements. To ensure the requirements are delivered according to customer expectations which requirements attribute should the BA consider including in the project requirements document?

A.

Unique identifier

B.

Priority

C.

Constraints

D.

Acceptance criteria

Full Access
Question # 84

After the implementation of a new financial solution the business analyst (BA) observes that the performance of a solution does not meet the anticipated benefits detailed in the original business case. What is a technique the BA can use to understand the reason for that?

A.

Data flow diagram

B.

Fishbone diagram

C.

Business capability analysis

D.

interface analysis

Full Access
Question # 85

In a requirements management effort, the business analyst (BA) has reviewed all the requirements and has completed assessing the various impacts of changes to some of the requirements. The BA is planning to share the impact of the changes to the stakeholders and obtain a consensus in resolution of some of the changes. Which technique will help the Ba obtain a resolution on the impact of the requirement changes?

A.

Focus groups

B.

Workshops

C.

Interviews

D.

Surveys

Full Access
Question # 86

Company A has been engaged to provided solution software to Company B as part of a combined service offering to Company C.

The initiative requires a sub project for Companies A and B learn Company Cs statutory requirements, a sub project for Company A to write custom functionality for the solution, and a sub project for Company B to develop infrastructure and support for the solution as well as the main project of implementation and cutover from Company Cs current data processing solution to the service from Company B, How does the business analyst (BA) assign requirements to the various solution components to ensure all objectives are met?

A.

Described Design Options

B.

Allocate Requirements

C.

Identify Improvement Opportunities

D.

Define Solution Approaches

Full Access
Question # 87

A company is about to embark upon a large organizational change initiative that involves restructuring its service offerings. A senior business analyst (BA) is assigned the work of establishing performance measures for the business analysis work to be performed by the 6A ream. Which of the following performance measures is appropriate to assess the value delivered by the work products against the cost time, and resource investments expended to create them?

A.

Strategy

B.

Effectiveness

C.

Significance

D.

Knowledge

Full Access
Question # 88

When determining the success criteria for an initiative a business analyst (BA) engages end users in order to understand what they would define is an effective solution. What two types of data will the end men need to perform the evaluation?

A.

Assessment and performance

B.

impact and dependencies

C.

Quantitative and qualitative

D.

Risk and value

Full Access
Question # 89

A business analyst (BA) was tasked with eliciting requirements for a new product scheduling system. The BA interviewed and discussed the requirements with the manager and Supervisor. The requirements were written and approved by both the supervise and manager. Which stakeholders were missed in the requirements?

A.

End users

B.

Project manager

C.

Upper management

D.

IT support

Full Access
Question # 90

A popular department store chain wants to make computer upgrades as well as conduct a major remodeling effort to increase revenue to all their 100 stores over the next 2 years. The remodeling will occur in two phases. The two phases are required at each store and can be completed in any order, but each phase must be fully completed before the next phase can begin. Phase 1 will take approximately 32 weeks and will not require a store to be temporarily closed. Phase 2 will take approximately 20 weeks and will require a store to be temporarily closed.

In order to keep inventory level and total revenue for the department store chain at an operational level, 75% of the stores must remain open to the public at all times. Against the board of director's advice, the Chief

Executive Officer (CEO) made a decision to start and complete the top 25 revenue-producing stores in the first year to get those stores remodeled and fully operational.

A business analyst (BA) has been brought in to help with planning the project and gathering requirements. What tool will help the BA understand the changes needed to keep the majority of the stores open?

A.

Capability Model

B.

Business capability analysis

C.

Transition State Diagram

D.

Stakeholder Matrix

Full Access
Question # 91

Whatare timeless events that show progress in the project.

These are typically achieved at the end of phase in the project lifecycle.

A.

Achievements

B.

Millstones

C.

Phases

D.

Templates

Full Access
Question # 92

Which of the following roles helps assess the data requirements of a project, identifies data assets, and helps the project team complete data modeling requirements?

A.

Database analyst

B.

End user

C.

Subject matter expert

D.

Information architect

Full Access
Question # 93

Which of the following charts is described in the statement below?

"It shows the causes of a certain event. A common use of this diagram is to identify potential factors causing an overall effect. It helps identify causal factors and contributing causes."

A.

Ishikawa

B.

Flowchart

C.

Process configuration chart

D.

Control chart

Full Access
Question # 94

Which of the following is the process of defining and analyzing the dangers to individuals, businesses, and government agencies posed by potential natural and human-caused adverse events?

A.

Risk analysis

B.

Risk identification

C.

Risk management

D.

Risk communication

Full Access
Question # 95

Which of the following document is created first after project is awarded and statement of work is handed over to the project manager?

A.

Work breakdown structure (WBS)

B.

WBS dictionary

C.

Project scope statement

D.

Project charter

Full Access
Question # 96

A company wants to launch an existing product in another channel and the business analyst (BA) is starting to perform the stakeholder analysis.

Legend: Influence/Impact 1 to 5 (1 = very limited impact/influence: 5 = very high impact/influence). Considering the analysis, what values for influence and impact will the BA assign to the marketing?

A.

Influence = 3 and impact = 3

B.

Influence = 1 and impact = 3

C.

Influence = 3 and impact = 1

D.

Influence = 5 and impact = 5

Full Access
Question # 97

A business analyst (BA) has been coordinating several meetings with stakeholders to reach consensus regarding the solution design to implement a global currency exchange system for an international bank. Consensus has not been reached yet, although BA has great communication skills and is trusted by all stakeholders. The stakeholders formally approved the business need initially.

Why is there disagreement?

A.

The requirements are interpreted differently by each stakeholder.

B.

The requirements are incorrectly traced.

C.

The approval authority for the solution is unclear.

D.

More solution alternatives need to be generated.

Full Access
Question # 98

Which of the following techniques involves coordinating and collaborating with other credible sources in risk?

A.

Risk identification

B.

Risk management

C.

Risk communication

D.

Risk analysis

Full Access
Question # 99

In a requirements elicitation effort, the business analyst (BA) needs to define boundaries for business domains, categorize and create a hierarchy of items, and show data sources and their relationships for specific audiences.

Which of the following modeling formats should the BA use?

A.

Diagrams

B.

Graphics

C.

Matrices

D.

Prototype

Full Access
Question # 100

Which of the following diagrams is known as Ishikawa diagram?

A.

Activity

B.

Data-flow

C.

Cost-Benefit

D.

Cause-and Effect

Full Access
Question # 101

You are the business analyst for your organization and are working on prioritizing the project requirements. Management has asked you to prioritize the requirements based on the cost-benefit analysis for the requirements' value to the organization.

What basis for prioritization are you using in this instance?

A.

Business value

B.

Stakeholder agreement

C.

Likelihood of success

D.

Urgency

Full Access
Question # 102

A business analyst (BA) is defining the decision-making process for changes raised during a project and wants to understand the decision making authorities within the company.

What might the BA do to gather this information?

A.

Market analysis

B.

Focus group

C.

Survey

D.

Cost benefit analysis

Full Access
Question # 103

A business analyst (BA) in a large financial institution, responsible for the management of requirements, has completed all the activities related to tracing requirements and is now pursuing to maintain them. The BA has identified a large number of requirements which have long term reuse and is now looking for guidance to manage these requirements.

Which of the following will indicate how requirements will be managed for reuse?

A.

Legal Regulatory Information

B.

Architectural Repositories

C.

Information Management Approach

D.

Business Rules Analysis

Full Access
Question # 104

Which of the following terms is used to describe a major deliverable or key even in the project used to measure project progress?

A.

Project life cycle

B.

Phase

C.

Achievement

D.

Milestone

Full Access
Question # 105

Which of the following requirement attributes lacks any ambiguous characteristics?

A.

Understandable

B.

User Requirements Document (URD)

C.

Unambiguous

D.

Urgency

Full Access
Question # 106

Which one of the following diagrams when properly laid out is always laid in a left to right display to properly reflect the chronology of all project work?

A.

Influence diagram

B.

Project schedule network diagram

C.

Arrow diagramming method

D.

Time-scaled schedule network diagram

Full Access
Question # 107

Which of the following process groups occurs at the beginning of the project?

A.

Executing

B.

Planning

C.

Initiating

D.

Controlling and Monitoring

E.

Closing

Full Access
Question # 108

Which of the following can be used in root cause analysis?

A.

Pareto chart

B.

Data-flow diagram

C.

Gantt chart

D.

Fishbone diagram

Full Access
Question # 109

While validating requirements for a software implementation project, the business analyst (BA) needs to identify scenarios that would alter the benefit delivered by a requirement.

Which of the following techniques should the BA use to identify such scenarios?

A.

Risk Analysis and Management

B.

Metrics and Key Performance Indicators

C.

Data Modeling

D.

Document Analysis

Full Access
Question # 110

The business process model is also known as.

A.

Organization model

B.

Activity model

C.

Relational model

D.

Data flow model

Full Access
Question # 111

A sports wristwatch product manufacturer wants to add a blood sugar monitoring toolkit to the watch. Market research has confirmed that the most profitable segment of the manufacturer’s target customer is looking for this feature. The business analyst (BA) worked with the product owner to finalize the set of requirements and design options and then defined multiple approaches for implementing the feature. At this point, the solutions' team agreed that they were unable to accurately assess the merits of each of the proposed solutions.

What is the possible reason?

A.

Requirements are not allocated to solution components

B.

Too many approaches are dividing the team

C.

Business needs are unclear to the team

D.

Requirements and design options are not detailed enough

Full Access
Question # 112

Contracts are currently managed by more than 20 contract owners across the organization, each happily managing in their own way. A business analyst (BA) is tasked to elicit requirements for centrally managing software maintenance and license contracts.

Which of the following does the BA need to carry out first?

A.

Identify business requirements

B.

Identify future state conditions

C.

Recommend an off the shelf product

D.

Complete an enterprise readiness assessment

Full Access
Question # 113

The business analyst (BA) is facilitating a requirements workshop with a large group of diverse stakeholders, some of whom are not entirely familiar with the goals and objectives of the project.

The BA must understand the business domain, corporate culture, group dynamics, and expected outputs to adequately communicate the:

A.

change strategy.

B.

requirements prioritization.

C.

elicitation scope.

D.

enterprise architecture.

Full Access
Question # 114

Nancy has asked you to trace a particular requirement for her.

What does 'to trace a requirement' mean?

A.

Tracing a requirement means to look at a requirement and the others to which it is related. It links risk,

cost, quality, and scope elements to stakeholder and solution requirements to other artifacts created by the team and to solution components.

B.

Tracing a requirement means to look at a requirement and the others to which it is related. It links business requirements to stakeholder and solution requirements to other artifacts created by the team and to solution components.

C.

Tracing a requirement means to look at a requirement and the others to which it is related. It links business requirements to components in the project's work breakdown structure.

D.

Tracing a requirement means to track a requirements from its first identification all the way to its completion to see what issues, risks, costs, quality, and defects have surrounded the requirement

Full Access
Question # 115

You and Tom are writing the solution scope for a new project in your organization. You need to create a method to define what solution will and will not provide for the organization.

What technique can you and Tom use to establish appropriate boundaries for the solution?

A.

Interviews with the key stakeholders

B.

User stories

C.

Functional decomposition

D.

Scope modeling

Full Access
Question # 116

Which of the following software development life cycles is a methodology that divides the project into phases, and the project manager focuses on control of time, cost, and scope?

A.

Spiral

B.

Agile

C.

Waterfall

D.

Incremental

Full Access
Question # 117

Which of the following is the process of developing a document that formally authorizes a project or a phase?

A.

Define Scope

B.

Develop Schedule

C.

Develop Project Charter

D.

Create Work Breakdown Structure

Full Access
Question # 118

Which of the following tasks cannot start until other tasks are completed?

A.

Analysis task

B.

Dependent task

C.

Predecessor task

D.

Independent task

Full Access
Question # 119

A business analyst (BA) facilitated elicitation activities with subject matter experts and end users using observation, workshops, and interviews.

After comparing the results, how should the BA resolve the variations?

A.

Identify a few key stakeholders to resolve the conflicts

B.

Set up additional activities to collaboratively resolve the issues

C.

Remove requirements that cause differences

D.

Weight the results from the observation because it is more reliable

Full Access
Question # 120

Which of the following is derived from a schedule model to meet the project execution plan and achieve management approval for use as a baseline?

A.

Updating

B.

Impacts

C.

Baseline schedule

D.

Dumping

Full Access
Question # 121

What portion of the communications model could be defined as the translator?

A.

Receiver

B.

Medium

C.

Translator

D.

Sender

Full Access
Question # 122

You are the business analyst for your organization and are with another business analyst, Steve, on the requirements elicitation for a new solution. You warn Steve that you'll need to be tracing the requirements in an effort to prevent scope creep.

What is scope creep?

A.

The scope grows slightly larger as more requirements, often unneeded, are added to the scope

B.

The scope slips on the schedule which in turn delays the project delivery date

C.

Gold plating

D.

The scope shifts from the original intent of the business case

Full Access
Question # 123

Which of the following processes is used to make certain that the project team members are completing the project work according to the project plan?

A.

Project time management

B.

Project scope management

C.

Quality management plan

D.

Quality control

Full Access
Question # 124

You have identified a task in your task list that cannot be completed until the inspector for the project signs off on the initial deliverables.

The inspector's signoff on the initial deliverables is called what?

A.

Assumption

B.

Dependency

C.

Milestone

D.

Constraint

Full Access
Question # 125

You are the business analyst for your organization. Management has asked that you create a stakeholder map as part of the conduct stakeholder analysis process.

What is a stakeholder map?

A.

A stakeholder map is a visual diagram that shows the connection among positive and negative stakeholder

B.

A stakeholder map is a visual diagram that illustrates where the stakeholders are geographically located.

C.

A stakeholder map is a visual diagram that depicts the stakeholders' actions as responsible, accountable consult, and inform.

D.

A stakeholder map is a visual diagram that depicts the relationship of the stakeholders to the solution and to one another.

Full Access
Question # 126

Which of the following statements best describes the purpose of the confirm elicitation results process?

A.

Validate that the stated requirements expressed by the stakeholders match the solution the organization has proposed.

B.

Validate that the stated requirements expressed by the stakeholders match the stakeholders' understanding of the problem and the stakeholders' needs.

C.

Validate that the stated requirements expressed by the stakeholders match the documented requirements of the project sponsor.

D.

Validate that the stated requirements expressed by the stakeholders match the project scope.

Full Access
Question # 127

There are four inputs to writing the business case as part of enterprise analysis.

Which one of the following is not an input to writing the business case process?

A.

Business need

B.

Assumptions and constraints

C.

Requirements verification

D.

Stakeholder concerns

Full Access
Question # 128

The RGQ Organization utilizes a change log.

What is a change log?

A.

It is a document that records all change requests for the project.

B.

It is a document that tracks all unauthorized changes to the project solution.

C.

It is a document that tracks all characteristics and status of changes that have been received.

D.

It is a document that tracks the changes that have been received, including their implementation to the project solution.

Full Access
Question # 129

You are the business analyst for your organization. You want to use a requirements elicitation technique to produce a broad set of options for an identified problem. You want the stakeholders to help you identify options, factors that affect the solution, any possible delays in the solution implementation, and ideas for creating a solution.

Which of the following requirements elicitation activities would best satisfy these requirements?

A.

Benchmarking

B.

Brainstorming

C.

Data flow diagrams

D.

Business rules analysis

Full Access
Question # 130

Management would like you to front-load the requirements with the most risk requirements.

Why would management prefer the risky requirements first in the prioritization?

A.

So if the risk comes true the project will fail will little investment in the work.

B.

So if the risk comes true then the project manager can mitigate the risk event.

C.

So if the risk comes true they'll receive the reward as soon as possible.

D.

So if the risk comes true then there's ample time to correct the problem.

Full Access
Question # 131

Bob and Susan are business analysts for their organization. They are examining two materials that could be used in an upcoming project. They are testing the materials and measuring the results of each test to compare the materials to each other. This process will help Bob and Susan determine which material is best for their upcoming project.

What type of process are Bob and Susan completing with these materials?

A.

Feasibility study

B.

Stress test

C.

Alternative identification

D.

Benchmarking

Full Access
Question # 132

Gina has been asked to provide decision analysis for her solution scope.

Which one of the following best describes the decision analysis technique?

A.

Assessed to support benefit management, measurement, and reporting.

B.

Used to assess potential risks that may impact the solution and the cost and benefits associated with it.

C.

Forecasts the size of the investment required to deploy and operate the proposed solution.

D.

Cost-benefit analysis compares the cost of implementing a solution against the benefits gained. Financial analysis includes the use of financial models that estimate the market value of an organizational asset.

Full Access
Question # 133

A project's change in scope is assessed and a newly assigned business analyst (BA) is unsure how to communicate the findings and final decision to the wider stakeholder group.

In which of the following can the BA find this information?

A.

Stakeholder Communications Plan

B.

Business case

C.

Business policies

D.

Governance approach

Full Access
Question # 134

A company that specialized in manufacturing vending machines for books has been in business for 10 years. As the e-book and online retailing grow, the company perceived that a change is required to respond to the new emerging market forces. However, the change should focus on reusability as much as possible to reduce expenses. After analyzing the current state with the business subject matter experts, the business analyst

(BA) proposed investing in a new business line of vending machines that sell pay per use mobile device phone fast charging stations.

Due to the urgency of this change, the BA was asked to finalize requirements elicitation in the shortest possible time.

Customers who want to utilize the pay per use mobile device fast charging stations may choose one of two features: fully charged (F1) or partially charged (F2). If partially charged is selected, the customer needs to specify their charging needs.

What is the relationship between F1 and F2?

A.

Validate

B.

Derive

C.

Depends

D.

Satisfy

Full Access
Question # 135

You are the business analyst for your organization and are working with Ralph who is also a business analyst at your company. You have moved one of the requirements higher in the prioritization of the requirements because it is needed to be implemented before some of the more important requirements are done. Ralph disagrees with your placement of the requirement because you are to rank the requirements based on their level of difficulty.

Who is correct and why?

A.

Ralph is correct because the requirements are always to be ranked by importance or business value.

B.

You are correct because the lower priority requirements must be completed before the higher priority requirements can be done.

C.

You are correct because you are the senior business analyst.

D.

Ralph is correct because the sequence of requirements is actually done with the project activity list.

Full Access
Question # 136

You are the business analyst for your organization and are planning the business analysis approach. One of the techniques you are considering for this undertaking is to rate the available methodologies against the organizational needs and objectives.

Which of the following terms describes the business analysis technique that you are currently considering in this scenario?

A.

Structured walkthrough

B.

Decision analysis

C.

Cause-and-effect analysis

D.

Process modeling

Full Access
Question # 137

Martha is observing Gary complete several activities as part of her requirements elicitation process. Martha is simply observing the steps Gary takes to complete his work and she is taking notes. In this instance Martha does not ask Gary any questions.

What type of observation technique is Martha completing?

A.

Shadowing

B.

Active

C.

Passive

D.

Usage consideration

Full Access
Question # 138

The solutes presented by a business analyst (BA) to the stakeholders eliminated the need to maintain different variations of ship-to-country and location-to-rout* for various freight carriers. Instead, the routing would use a standard carrier code, giving the business me flexibility to just ship to new countries without raising a change request to IT. which was the current road-block to business. What opportunity did the BA present to the stakeholders?

A.

Increase efficiencies

B.

Decrease stakeholder involvement

C.

increase access to information

D.

Decrease project timeline

Full Access
Question # 139

A health insurance provider undertakes enhancements to its mobile application platform and finalizes the following capabilities as part of the scope of the next release:

I. Ability to integrate online maps and global positioning system (GPS) technology with the mobile application In real time to display location of service providers in the subscriber's vicinity that participate in the subscriber's plan network.

II. Ability for the subscriber to lookup the service providers by specifying either a postal code or a search area radius in miles.

III. Ability for the subscriber to initiate the download of fee information for one or more service providers in a single request.

Through requirements workshops the business analyst elicits the following detailed business requirements:

1. The company's mobile application platform must support real time integrate with the following third party systems:

A GPS System

B. Postal Code Validation

What kind of relationship is used to describe the traceability between requirement 8 and the solutes artifacts that implement it?

A.

Satisfy

B.

Validate

C.

Depends

D.

Derive

Full Access
Question # 140

The stakeholder of a new product that is in early adaptive development has requested a change to an approved feature. How should the business analyst (BA) handle this change?

A.

Change the business analysis approach to predictive

B.

Obtain formal approval through change request process

C.

Include The requirement in the next Iteration

D.

Add the feature to the product backlog for future prioritization

Full Access
Question # 141

Before investing further in the project, a customer and the stakeholder of the project wants to be able to visualize the final product. Which elicitation technique should the business analyst (BA) select?

A.

Interface Analysis

B.

Prototyping

C.

Reverse gineering

D.

Observation

Full Access
Question # 142

The business analyst (BA) presented a concept model during a requirements walk through to the project sponsor, implementation subject matter expert and operational support start. While the presentation was clear to the project sponsor the other stakeholders were unsure about the impacts to their respective daily tasks. What should the BA include in the next walk through, so that all stakeholders have a better understanding of the requirements?

A.

A. An information management model to identify requirement gaps

B.

A capability model to illustrate strategic objectives

C.

A governance architecture to contextual^ toe business analysis approach

D.

An appropriate level of abstraction to support differing viewports

Full Access
Question # 143

A business analyst (BA) is preparing for observation. A passive approach has been selected for establishing performance metrics. What should be identic for the next step?

A.

Performance measures

B.

Dependencies

C.

Participants

D.

Communication channels

Full Access
Question # 144

A business analyst (BA) finds that the solution service level agreement (SLA) cannot be met m one out of five identified scenarios. is there 4 a dependency on a requirement which is a part of a future release. How should the BA approach the solution limitation?

A.

Assess the impact on the business operations

B.

Increase the scope and include the dependent requirement

C.

Modify the SLA

D.

Change the business process

Full Access
Question # 145

A conservative company with rigorous risk control plans and internal audit rules has a recurrent problem with a core Business application. As a result access to this application must be restricted and controlled and maintenance must be on-site. However, the company feels that the application must have an emergency service team. The routine maintenance of this solution is provided by an external vendor and the vendor requested 24 hours remote access to quality and production data. In this context what is the company's response to the vendor's request?

A.

Dented because of the company’s risk aversion

B.

Accepted, because the company has an urgent problem to solve

C.

Denied- because the vendor requested it

D.

Accepted, because immediate remote access will resolve any issue

Full Access
Question # 146

A utility company found mat its current billing system charges customers 'or tie r usage, but does so incorrectly when the system estimates reads on meters rather than performs actual reads. Company stakeholders would i*e to improve this aspect of the system but are hesitant to make changes because they are otherwise pleased with the system A business analyst (BA) has completed a current state diagram and would like to start discussions on what the future state may look like. What information can the BA determine by having a current slate diagram?

A.

The needs for the future state solution

B.

The cost/benefit measures for the new system

C.

The strengths and weaknesses of the current system

D.

The change management plan for implementation

Full Access
Question # 147

You are the business analyst for your organization and are beginning the requirements analysis processes.

Which one of the following statements best describes the requirements analysis processes?

A.

It ensures that analysis and implementation efforts focus on the most critical requirements.

B.

It covers the definition of stakeholder requirements, which describe what a solution must be capable of doing.

C.

It defines all of the work, and only the required work, to complete the project objectives.

D.

It is conformity to requirements and a fitness for use.

Full Access
Question # 148

You are the business analyst for your organization. On your current project you'll be using the change-driven approach for defining requirements and gathering feedback.

Which of the following statements best describes the change-driven approach?

A.

The change-driven approach favors defining requirements through experimentation.

B.

The change-driven approach does not define the requirements until after a solution for the problem has been identified.

C.

The change-driven approach favors defining requirements standardized templates.

D.

The change-driven approach favors defining requirements through team interaction.

Full Access