New Year Special Sale - Limited Time 70% Discount Offer - Ends in 0d 00h 00m 00s - Coupon code: mxmas70

Home > SAP > SAP Certified Application Associate > C_TS422_2022

C_TS422_2022 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Question and Answers

Question # 4

How can a material availability check be triggered automatically for a production order?

Note: There are 2 correct answers to this question.

A.

By capacity planning

B.

By mass processing

C.

By order release

D.

By order confirmation

Full Access
Question # 5

which SAP application can be used for forecasting in Supply Chain Planning?

Note: there are 2 correct answers to this question.

A.

Integration Business Planning (IBP)

B.

Capacity Requirement Planning (CRP)

C.

Supply Chain Management (SCM)

D.

Material Requirement Planning (MRP)

Full Access
Question # 6

You want to insert an operation at a certain time on a work center in the graphical planning table. The planning direction is forward. The planning direction is forward. The desired dispatching time coincides with an operation that has previously been dispatched, how does the insertion take place?

A.

The new operation is inserted at the desired time; the previous dispatched operation is moved forward.

B.

The new operation is inserted at the desired time; the previously dispatched operation is moved backward

C.

The previously dispatched operation stays as is; the new operation is inserted after the dispatched operation.

D.

The previously dispatched operation stays as is; the new operation is inserted before the dispatched operation.

Full Access
Question # 7

in your Plant, MRP is activated.

which options do you have to exclude a material from the MRP run?

Note: there are 2 correct answers to this question.

A.

Use a specific material status

B.

Use a specific material group

C.

Use a specific MRP type

D.

Use a specific MRP list

Full Access
Question # 8

How can you set up the supply source for the Kanban process in SAP S/4HANA?

Note: There are 3 correct answers to this question.

A.

Use stock transfer reservations for stock transfer.

B.

Use purchase orders for external procurement.

C.

Use quotations for internal and external procurement

D.

Use run schedule quantities for in-house production.

E.

Use purchasing costs for automated source prioritization.

Full Access
Question # 9

Where do you maintain data to determine the duration of an operation for production? Note: There are 2 correct answers to this question.

A.

Routing

B.

Work Center

C.

Bill of material (BOM)

D.

Material Master

Full Access
Question # 10

Your quality department detects a deviation in a raw material batch. Unfortunately, this batch has already been used in production. How can you identify all affected finished goods stocks?

Note: There are 2 correct answers to this question.

A.

Use the Batch Information Cockpit.

B.

Use batch derivation.

C.

Use batch determination

D.

Use the batch where-used list.

Full Access
Question # 11

What time element of midpoint scheduled operations can be reduced by reduction strategy settings while dispatching? Note: There are 2 correct answers to this question

A.

Queue

B.

Teardown time

C.

Move time

D.

Setup Time

Full Access
Question # 12

What are the possible results of a production planning run in Advanced Planning (PP/DS)? Note: There are 2 correct answers to this question.

A.

Scheduling agreement schedule line

B.

Purchase Order

C.

Planned Order

D.

Production Order

Full Access
Question # 13

How can you limit the validity of a bill of material (BOM)? Note: There are 2 correct answers to this question,

A.

By Plant

B.

By Period

C.

By Industry

D.

By Material Status

Full Access
Question # 14

You want to schedule an operation finitely, without removing other operations. Which scheduling strategy do you select?

A.

Insert operation

B.

Squeeze in

C.

Schedule in working time only

D.

Find Slot

Full Access
Question # 15

Which of the following questions do you have to answer before you start creating a bill of material (BOM)?

A.

Is the material type allowed in the BOM?

B.

Which base unit of measure does the material have?

C.

What status does the BOM have?

D.

In which storage location is the BOM required?

Full Access
Question # 16

You use planning strategy Finite Scheduling with Reverse and want to allow scheduling the past. How can you parameterize this in the strategy profile?

A.

Specify a negative planning horizon.

B.

Specify a positive planning horizon.

C.

Specify a positive offset time.

D.

Specify a negative offset time.

Full Access
Question # 17

You want to set up a make-to-order planning scenario for a finished material. The bill of materialcontains two components: one should be procured for each sales order individually, and the other should be procured jointly for all independent requirements Forecasting for the finished product is NOT possible. Which settings do you make to achieve this?

A.

Choose planning strategy 50 (Planning without final assembly) and select the — corresponding Individual/Collective indicator.

B.

Choose planning strategy 50 (Planning without final assembly) and select the corresponding Mixed MRP indicator.

C.

Choose planning strategy 20 (Make-to-Order) and select the corresponding Mixed MRP indicator.

D.

Choose planning strategy 20 (Make-to-Order) and select the corresponding ndividual/Collectiveindicator.

Full Access
Question # 18

Under what circumstances can you change the material type for a material if stocks, reservations, or purchasing documents exist? Note: There are 2 correct answers to this question.

A.

The same batch management level is used

B.

The same base unit of measure is used.

C.

The quantity and value updates are the same

D.

The same account category is used

Full Access
Question # 19

You want to trigger in-house production of a semi-finished material before a sales order for the corresponding finished good is received. Which planning strategy supports the consumption of planned independent requirements for the semi-finished material?

A.

Planning with final assembly (40)

B.

Production by lot size (30)

C.

Planning at assembly level (70)

D.

Make-to-order production (20)

Full Access
Question # 20

What is the work center hierarchy in capacity planning?

A.

A group of work center in a parallel sequence that is used to split production quantities and work on them in parallel

B.

A group of alternative work centers providing a cumulative available capacity for production

C.

A group of work centers in a production line being used in sequence for production

D.

A group of alternative work centers for production, structured in hierarchy levels by priorities

Full Access
Question # 21

You need to model goods receipt processing time in detailed scheduling. Which modeling options do you have?

Note: There are 3 correct answers to this question.

A.

Model a separate resource in the production data structure.

B.

Model a handling resource in the location master.

C.

Model a transportation lane and carrier selection in the location master.

D.

Model a separate inbound resource in the location master.

E.

Model a goods receipt time in the material master.

Full Access
Question # 22

For production orders, cost object controlling (COC) can be carried out on an order-related or product- related basis. Which of the following do you have to consider?

Note: There are 2 correct answers to this question.

A.

In pro duct-related COC, all costs are debited and credited to a product cost collector.

B.

Order-related COC is beneficial in a flexible production environment

C.

Product-related COC is used in manufacturing for co-products

D.

In order-related COC, individual production orders do NOT have cost segments.

Full Access
Question # 23

What does the material type influence?

Note: There are 2 correct answers to this question.

A.

Which document types and class categories are allowed

B.

Which material master screens appear and in which sequence

C.

Whether the material is produced in-house, procured externally, or both

D.

Which plant-specific and plant-independent statuses are allowed

Full Access
Question # 24

How can you support a GMP (Good Manufacturing Practice)-compliant production process?

Note: There are 3 correct answers to this question.

A.

Approved resources

B.

Digital signature

C.

Batch record

D.

GMP-compliant flag

E.

Recipe approval

Full Access