C_TS422_2021 SAP Certified Application Associate - SAP S/4HANA Production Planning and Manufacturing Question and Answers

Question # 4

When working with bouth cross-plant and plant-specific material statuses n the material master, which statuses has the higest priority?

A.

The cross-plant status

B.

The plant-specific status

C.

The last restrictive status

D.

The most restrictive status

Full Access
Question # 5

Which of the following are possible configuration steps when setting up the alert monitor in Advance Planning?

A.

Create object selection variant for transportation lane-related alerts.

B.

Create object selection variant for product-related alerts.

C.

Assign the overall profile to the authorization profile.

D.

Assign the alert profile to the overall profile.

Full Access
Question # 6

Which of the following questions do you have to answer before you start creating a BOM?

A.

In which storage location is the BOM required?

B.

Which Valid To information is necessary?

C.

Is the material type allowed in the BOM?

D.

What status does the BOM have?

Full Access
Question # 7

In the Schedule Production app which setting can you make for the planning strategy?

A.

Fitness level

B.

Scheduling control

C.

Fixed pegging

D.

Direction

E.

Planning mode

Full Access
Question # 8

Which standard item categories can you select inside a bill of material (BOM)? Note: There are 2 correct answers to this question.

A.

Non-stock item

B.

Work item

C.

Variable-size item

D.

WBS item

Full Access
Question # 9

Which item statuses can you select inside a material BOM?

A.

Service

B.

Sales

C.

Quality management

D.

Engineering

Full Access
Question # 10

Which time elements are relevant for lead time scheduling of a production order?

A.

Float after production

B.

Planned delivery time

C.

Total replenishment lead time

D.

Setup time

Full Access
Question # 11

How can you carry out cost object controlling for production orders?

A.

Milestone-related

B.

Cost-related

C.

Product-related

D.

Order-related

Full Access
Question # 12

You are working with planning strategy 40 (Planning-with-final assembly)

When does consuption of planned independent requirements take places?

A.

When you deliver a sales order

B.

When the MRP result are saved

C.

When you create a sales order

D.

When you create a planned order

Full Access