Which Status allows you to make a usage decision without using the force inspection competition function for all mandatory characteristic results ?
Which settings are required for the immediate creation of inspection instruction during goods receipt process. Note : 3 correct answer
Your customer uses MIC and requests automatic defect recording After configuration defect recording the implementation Guide ,which additional steps must you perform to satisfy customer requirements?(2 correct ans)
The quality inspector records defects in results recording for a material inspection When creating notification the system determines the catalog profile by consulting objects in which of following sequences?
Your customer wants material -dependent code selected from a catalog to show when a Where can you control and limit the codes?
Your customer record defects a characteristic level with in result recording and wants to correct all defects for each inspection.
How do you satisfy the customer requirement?
During which of the following steps in a business process does a dynamic modification rule change severely.
What is required in inspection planning to transfer a characteristic value from results recording of inspection lot processing
You use a status profile in the quality info record in procurement Under which circumstances does the system create an inspection lot of the next supplier relationship during gr processing?