1z0-1075-24 Oracle Manufacturing Cloud 2024 Implementation Professional Question and Answers

Question # 4

In a manufacturing plant, two purchase components, PI and P2, and a resource, Rl, are required to assemble a product. The cost of the assembly is calculated by using the standard costing method. The work definition and resource rates for the assembly have been defined as Required.

A Cost Accountant is estimating cost of the assembly, and analyzing rolled-up costs before finally publishing estimates as frozen standards to Cost Accounting by using a Cost Planning Scenario. While reviewing rolled-up costs, the extended costs of purchase components are not included in a rolled-up scenario.

What is the reason for this?

A.

Costs for purchase components PI and P2 are not defined In Cost Accounting.

B.

Purchase components PI and P2 are not associated with the material cost plan of the Cost Planning Scenario.

C.

Create Accounting was not initiated.

D.

Create Accounting Distributions was not initiated.

Full Access
Question # 5

Which three requirements are fulfilled by nonstandard work orders?

A.

Rescheduling

B.

Repair

C.

Rework

D.

Prototype

Full Access
Question # 6

A manufacturing plant has two shifts of eight hours each for the work center WCI: day shift and night shift. You associate four units each of the resources R1, R2, R3, and R4 to WCI. The customer wants to assign ail units of R2 available for day and night shift.

What is the correct sequence of steps to achieve this?

A.

Associate R2 with WC1 > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

B.

Associate R2 with WC1> Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 4in the Day Shift column > Enter 4 In the Night Shift column.

C.

Associate R2 with WCI > Select the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 in the Day Shift column > Enter 2 in the Night Shift column.

D.

Associate R2 with WCI > Deselect the Available 24 Hours check box > Go to the Resource Availability region > Enter 2 In the Day Shift column > Enter 2 In the Night Shift column.

Full Access
Question # 7

Which three statements are true about managing Units of Measure?

A.

You must define the unit of measure class with a base unit of measure.

B.

If you want to transact items in units of measure that belong to classes other than their primary UOM class, you must define conversions between the base units of measure in different UOM classes.

C.

A unit of measure standard conversion specifies the conversion factor by which the unit of measure is equivalent to the unit of measure class.

D.

Conversions between classes are unique for each item; the conversion rate varies for intraclass units of measure.

E.

A unit of measure conversion is a mathematical relationship between two different units of measure.

Full Access
Question # 8

Your client's company is in a regulated industries and must keep detailed records of their product manufacturing processes in accordance with the United States Food and Drug Administration (FDA) regulation on electronic records and signatures called 21 Code of Federal Regulations (CFR) Part 11.

You are implementing Oracle E-Signatures and E-Records for securely capturing, storing, retrieving, and printing electronic records and signatures in manufacturing. They enable Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release in Oracle Manufacturing Cloud.

Which statement is NOT true about using Deferred Electronic Records and Electronic Signatures for Manufacturing Work Order Release?

A.

It generates e-records on initial work order release through UI and sends notifications to approvers.

B.

Using a deferred approval process with notifications, the work order is held in "Released" status until the approvals are obtained.

C.

If the e-record is rejected, you can optionally resubmit the rejected electronic records.

D.

These capabilities are supported for discrete and process work orders.

Full Access
Question # 9

Your customer is a light assembly manufacturing company that doesn't require shop floor control. A Manufacturing Engineer wants to generate a work definition automatically for some items, and wants to eliminate the explicit maintenance of work definitions.

Which three steps must they perform and verify in the Work Definition area?

A.

Select a resource to be used in automatic work definition by enabling the Default attribute for automatic work definition.

B.

Ensure the predefined work definition name ORA_MAIN is active.

C.

Ensure the item is a standard item with a secondary item structure.

D.

Ensure there is only one default standard operation at any point in time.

E.

Select a standard operation to be used in automatic work definition by enabling the Default attribute for automatic work definition.

Full Access
Question # 10

Which three are Cost accounting methods'

A.

Perpetual Average Cost

B.

Layer Cost, also known as "LIFO"

C.

Frozen Standard Cost

D.

Actual Cost, also known as "FIFO"

E.

Periodic Actual Cost

Full Access
Question # 11

Which three types of item quantities are displayed on the Work Order History tab?

A.

In Process

B.

Scrapped

C.

Completed

D.

Remaining

E.

Total

Full Access
Question # 12

You create a work order, in which some of the operations have components with the Push supply type. While reporting material consumption on the Report Material Transaction page, you want the Push components to default whenever the operator selects Show Components.

Which setup task must you perform in the Manage Plant Parameters section to achieve this?

A.

Set Default Transaction Mode to Entered and Default Transaction Quantity to Work Definition.

B.

Set Default Transaction Mode to Work Definition.

C.

Set Default Transaction Mode to AIL

D.

Set Default Transaction Mode to Entered.

Full Access
Question # 13

You are implementing project-driven supply chain functionality. You need to set up movement requests to issue or transfer project material to manage the inventory associated with projects and tasks.

Which two are types of movement requests to issue or transfer project material?

A.

Transfer project material from one subinventory to another.

B.

Pick transactions Interfaced by the project costing project and task using the project material, common Inventory, or Inventory from another project.

C.

Create o movement receipt line with the Project Costing widget.

D.

Perform manual pick for such movement requests using the project material, common inventory, or inventory from another project.

Full Access
Question # 14

In which two places can you create and edit user-defined work order statuses?

A.

Scheduled Processes

B.

Work Definition work area tasks

C.

Functional Setup Manager > Setup: Manufacturing and Supply Chain Materials Management

D.

Work Execution work area tasks

Full Access
Question # 15

Which three statements are true about the main areas of Managerial Accounting?

A.

Receipt Accounting Is the application that performs accrual accounting for all types of receipts.

B.

Landed Cost Management gives organizations financial visibility into their extended supply chain costs.

C.

Supply Chain Orchestration automatically selects the correct process based on user-defined Subledger Accounting rules when a supply creation Is initiated.

D.

Cost method can be defined with granularity down to individual Items.

Full Access